29
Figure 25. USA, Three Phase, 230 volt Junction Box
Units with Metal Junction Box (USA),
3-Phase, 230 volt
NOTE:
Wiring must be installed by a qualified
electrician.
Adjust the service cord(s) so that the cord
reaches the appropriate motors when the trol-
leys are in the outermost position that they’ll
travel to. Allow for some droop in the cord(s), as
shown in Figures 4 and 23. Insert the cord(s)
into the junction box, as shown, leaving at least
12” slack outside the box. The cord(s) may be
cut to allow about 7” of wire length inside the
junction box.
Thread the cord from the drive cluster through
the bottom connector, as shown in Figure 25.
The cord may be shortened after allowing some
slack outside the box.
Insert the rotating contactor cord from the left,
as shown and wire according to Figure 25.
Boxes are shown with the cover removed for
illustration purposes only.
Do not operate your
Stir-Rite system with the cover removed!
Do
not remove the cover while power is being sup-
plied to stirring machine.
Black = 2
White = 3
Red = 4
Содержание STIR-RITE
Страница 23: ...23 Figure 18 Main Trolley Assembly Main Trolley Motor Mount 3 2 Motor Pulley Beam...
Страница 24: ...24 Cord Connections to Motors Figure 19 Cord Connections to Single or Multiple Down Augers...
Страница 45: ...45 APPENDIX...
Страница 46: ...46 Stir Rite System General Overview...
Страница 48: ...48 This page is intentionally left blank...
Страница 49: ...49 REPLACEMENT PARTS...
Страница 52: ...52 Stir Rite System Pivot Assembly...
Страница 54: ...54 Stir Rite System Main Trolley...
Страница 56: ...56 Stir Rite System Auxiliary Trolley...