![Neco STIR-RITE Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/neco/stir-rite/stir-rite_owners-operators-manual_3808455014.webp)
14
Figure 8. Rail Beam Assembly
Figure 9. Trolley Setup
Beam
Auxilliary Trolley(s)
Main Trolley
Bin Wall
Top View
9/16” Holes
NOTE:
• Make sure the track is smooth and not bent in
any way after installation.
• If necessary, cut off the top portion of the lad-
der to allow for clearance of the Rail Beam.
• After the track is completely installed, tighten
all the clip bolts. Keep the clips properly
aligned.
RAIL BEAM ASSEMBLY
Bring the beam into the bin and set it up on
wood or concrete blocks. See Figure 8. Make
sure 9/16” diameter holes are oriented upward
and are next to the bin wall under the man
hatch. Make sure the other end is positioned
under the center hatch.
Slide the trolley(s) onto the beam. Keep all
motor mounts on the right side (as viewed from
the bin center). The main trolley (also the larg-
est trolley) is mounted closest the bin wall. See
Figure 9.
IMPORTANT:
Trolleys must move freely along
the beam.
NOTE: 16” - 24” IS A COMFORTABLE HEIGHT
Bin
Wall
9/16” Holes
3/8” X 1” BoltS (4)
Beam
Bin Floor
Figure 7. Connecting Track to Splice Plates
NOTE: TOP EDGE OF SPLICE SHOULD BE
SMOOTH (MAXIMUM 1/16” STEP)
Bin Wall
3/8” Lock Nuts
Splice Plate
Track
3/8” X 1” Bolts (4)
Содержание STIR-RITE
Страница 23: ...23 Figure 18 Main Trolley Assembly Main Trolley Motor Mount 3 2 Motor Pulley Beam...
Страница 24: ...24 Cord Connections to Motors Figure 19 Cord Connections to Single or Multiple Down Augers...
Страница 45: ...45 APPENDIX...
Страница 46: ...46 Stir Rite System General Overview...
Страница 48: ...48 This page is intentionally left blank...
Страница 49: ...49 REPLACEMENT PARTS...
Страница 52: ...52 Stir Rite System Pivot Assembly...
Страница 54: ...54 Stir Rite System Main Trolley...
Страница 56: ...56 Stir Rite System Auxiliary Trolley...