PREPARE ASSEMBLY FOR STARTUP
• Remove the winch cables from the hanger channel and the beam.
• Remove the temporary 3/8” bolt just above the pivot pin on the pivot.
• Remove the heavy gauge wire that was wrapped around the main roller and track.
• ATTENTION:
Do not turn the machine on at this time.
CHECK LADDER CLEARANCE PRIOR TO STARTUP
IMPORTANT:
Check the clearance with the bottom of the outside auger and the bin ladder. If
there’s any chance that the auger could hit and catch on the ladder, fabricate a ladder guard.
Refer to Figure 36:
• NECO suggests using steel plate of at least 11 gauge (1/8”) thickness and 4” tall.
• The bends in the steel plate should be about 45° each
• Place the ladder guard as shown and sequrely bolt to the bin wall.
Figure 36. Ladder Guard Attachment
Drill and bolt
to the bin wall.
Ladder
Field Fabricate a 4” tall
piece of 11 gauge steel
Wall
Floor
Ladder Bottom
Содержание STIR-RITE
Страница 23: ...23 Figure 18 Main Trolley Assembly Main Trolley Motor Mount 3 2 Motor Pulley Beam...
Страница 24: ...24 Cord Connections to Motors Figure 19 Cord Connections to Single or Multiple Down Augers...
Страница 45: ...45 APPENDIX...
Страница 46: ...46 Stir Rite System General Overview...
Страница 48: ...48 This page is intentionally left blank...
Страница 49: ...49 REPLACEMENT PARTS...
Страница 52: ...52 Stir Rite System Pivot Assembly...
Страница 54: ...54 Stir Rite System Main Trolley...
Страница 56: ...56 Stir Rite System Auxiliary Trolley...