CHAPTER 2 INSTALLATION
Installation of Main Equipment
NEAX2000 IVS
2
Installation Procedure Manual
Page 64
ND-70928 (E), Issue 3.0
•
For Fixed Equipment
(1) Fix the BASE PLATE to the floor with anchor bolts.
(2) Fix the BASE to the BASE PLATE with screws. See
.
(3) Fix the PIM onto the BASE with screws. See
.
•
For Stationary Equipment
(1) Fix the BASE TRAY to the floor with anchor bolts.
(2) Fix the PIM onto the BASE with screws. See
.
(3) Place the Module and the BASE on the BASE TRAY. See
• Connect PIMs with screws. See
.
• Install the I/F BRACKET to the top-stack PIMs if the equipment is
stacked with five or more PIMs. See
• Install the TOP COVER to the top-stack PIM. See
• Install the MOUNTING BRACKET to the top-stack PIM if the equipment
is stacked with four or more PIMs. See
.
• Carefully review every step above to ensure that all necessary screws
are properly placed and tightened.
INSTALLATION OF
CHECKING
END
A
MULTIPLE-MODULE
INSTALLATION OF
TOP COVER
INSTALLATION OF
MOUNTING BRACKET
INSTALLATION
OF PIM
Содержание NEAX2000 IVS2
Страница 1: ...FEBRUARY 2001 NECAmerica Inc ND 70928 E ISSUE 3 STOCK 151998 Installation Procedure Manual...
Страница 19: ...NEAX2000 IVS2 Installation Procedure Manual Page x ND 70928 E Issue 3 0 This page is for your notes...
Страница 73: ...This page is for your notes NEAX2000 IVS2 Installation Procedure Manual Page 44 ND 70928 E Issue 3 0...
Страница 259: ...NEAX2000 IVS2 Installation Procedure Manual Page 230 ND 70928 E Issue 3 0 This page is for your notes...