![NEC NEAX2000 IPS Скачать руководство пользователя страница 111](http://html.mh-extra.com/html/nec/neax2000-ips/neax2000-ips_system-manual_251375111.webp)
CHAPTER 3 SYSTEM DATA PROGRAMMING
– 99 –
ND-71503(E) Rev.5.0
9pch3001.fm
(1) Programming Procedure to Main Site
Program the office data to the MP card of Main Site according to the following procedure.
Before the office data setting, confirm the following contents.
(a) Remote PIM over IP system (Number of Remote Site, IP network etc.)
(b) FP/AP type and FP/AP number which will be installed in the Main Site and Remote Site
(c) IP address of the Main Site and Remote Site
Programming Procedure to Main Site
START
Remote PIM over IP LAN Data Assignment
END
Remote PIM over IP VLAN Data Assignment
Survival Mode Assignment
Setting Office Data Copy
Remote PIM over IP
Feature Programming
Main Site/Remote Site
Constitution Data Assignment
Setting A-law/µ-law for Remote PIM over IP
JANUARY/16/2004
REMOTE PIM OVER IP DATA ASSIGNMENT
CÔNG TY VIỄN THÔNG VIỆT PRO
Chuyên phân phối tổng đài NEC
http://vietpro.com.vn