CHAPTER 3 SYSTEM DATA PROGRAMMING
– 96 –
ND-71503(E) Rev.5.0
9pch3001.fm
REMOTE PIM OVER IP DATA ASSIGNMENT
Remote PIM over IP System Setup
(1) Procedure of Initial Operation
STEP1:
Assign all required system data to the MP card of Main Site, including the required data for Re-
mote Site (CM0B Y=31-60).
STEP2:
Load all Key FD data to the Main Site.
For details, refer to Key FD Operation Guide.
[For other than North America]
STEP3:
Execute the system data backup to the Flash ROM of MP card by CMEC Y=6>0:0.
STEP4:
Save the system data of Main Site by MATWorX.
STEP5:
Clear the system memory of Remote Site by CM00>1.
STEP6:
Load the system data saved in STEP4 to all Remote Sites using MATWorX.
STEP7:
Assign the Remote Site numbers to each MP card of Remote Sites by CM0B Y=00>90.
STEP8:
Confirm that the link between Main Site and Remote Site is established.
If not, connect the Main Site and Remote Site by LAN.
– The required system data is copied to each Remote Site from the Main Site, and Remote Sites
starts.
JANUARY/16/2004
REMOTE PIM OVER IP DATA ASSIGNMENT
CÔNG TY VIỄN THÔNG VIỆT PRO
Chuyên phân phối tổng đài NEC
http://vietpro.com.vn