CHAPTER 3
NDA-24219
Page 38
Revision 2.0
NAP-200-003
Sheet 9/12
Installation of Main Equipment
Figure 003-7 Cable Connection on PZ-PW86/PW112 (Continued)
PZ-PW86(D)
MJ
MN
ON
BATTERY MODE SWITCH
GND
Note 2
FG
–27V
PWR CNT CA-A/
TO PWR1
AC CORD-A
TO AC MAINS INPUT
TO
TO PWR0A CONNECTOR
POWER OUTPUT
CONNECTOR
TO AUXILIARY
BATTERY CONNECTOR (BATT2)
ON
OFF
100/120V
240V
EQUIPMENT
GREEN
WHITE
BLACK
FRAME GROUND
Note 1:
Follow the Label on Front Plate of
PZ-PW86(D).
Note 2:
If GND (Signal GND) has to be
separated from FG (Frame GND),
remove the link between GND and
FG terminal
1: NO CONNECTION
2: ON-SEAL/FLOAT 2
–
O
1
2
ON
TERMINAL ON THE
Note 1
TO OTHER PZ-PW86
PWR CA-A
TO BATTERY OR
OTHER PZ-PW86
BATTERY CONNECTOR (BATT1)
BATTERY CABLE/PWR CA-A
CHASSIS
•
PZ-PW86(D)
CAUTION:
Set the appropriate volt-
age before turning on the
SW switch.
CABLE (+5V, –27V,E)
PWR CNT CA-C
OFF-OPEN/FLOAT 1
Содержание NEAX 1000 IVS
Страница 14: ...REGULATORY INFORMATION NDA 24219 Page xii Revision 2 0 This page is for your notes ...
Страница 20: ...CHAPTER 2 NDA 24219 Page 6 Revision 2 0 2 2 Installation Methods Figure 2 3 Wall Mounting Installation PIM ...
Страница 21: ...NDA 24219 CHAPTER 2 Page 7 Revision 2 0 Figure 2 4 19 Inch Rack Mounting Installation PIM 19 BRACKET H ...
Страница 22: ...CHAPTER 2 NDA 24219 Page 8 Revision 2 0 Figure 2 5 Desktop Installation PIM ...
Страница 142: ...CHAPTER 3 NDA 24219 Page 128 Revision 2 0 This page is for your notes ...