NDA-24219
CHAPTER
3
Page 125
Revision 2.0
NAP-200-011
Sheet 1/1
Operation Test
1.
OPERATION TEST
Confirm the entered system data and hardware, including cable connection, by completing the following operational
tests.
•
Basic Connection Test at MDF
-
Station Line Test (Operator Call from all stations)
-
Central Office Trunk Test (Incoming, Outgoing)
-
Tie Line Trunk Test (Incoming, Outgoing)
•
Service Feature Test
-
Call Transfer
-
Step Call
-
Executive Right of Way
-
Call Hold
-
Call Back
-
Call Forwarding-All Calls/No Answer/Busy Line
-
Call Pickup
-
Station Hunting-Pilot/Circular
-
Speed Calling-System/Station
-
Paging Access
-
Announcement Service
-
etc.
Содержание NEAX 1000 IVS
Страница 14: ...REGULATORY INFORMATION NDA 24219 Page xii Revision 2 0 This page is for your notes ...
Страница 20: ...CHAPTER 2 NDA 24219 Page 6 Revision 2 0 2 2 Installation Methods Figure 2 3 Wall Mounting Installation PIM ...
Страница 21: ...NDA 24219 CHAPTER 2 Page 7 Revision 2 0 Figure 2 4 19 Inch Rack Mounting Installation PIM 19 BRACKET H ...
Страница 22: ...CHAPTER 2 NDA 24219 Page 8 Revision 2 0 Figure 2 5 Desktop Installation PIM ...
Страница 142: ...CHAPTER 3 NDA 24219 Page 128 Revision 2 0 This page is for your notes ...