![background image](http://html.mh-extra.com/html/nec/neax-1000-ivs/neax-1000-ivs_system-manual_251362063.webp)
NDA-24219
CHAPTER
3
Page 49
Revision 2.0
NAP-200-006
Sheet 2/2
Cable Running to MDF
2.
CABLE RUNNING TO EXTERNAL MDF
(1) Bring the MDF cable up to the Main Equipment through the cable hole(s) of the bottom cover.
(2) Connect the champ connector of each MDF cable to an LTC connector located on a PIM using the screws
provided, as shown in
(3) Pare the sheath of each MDF cable and secure the shield to the bottom of the PIM using tie wraps, as shown
Figure 006-2 Cable Running to External MDF
LTC CONNECTOR
CHAMP CONNECTOR
FRONT
TO MDF
PIM
PBX
PIM
MDF
CABLE
TIE WRAP
25-30 mm
(1.0-1.2 inch)
SHIELD
Содержание NEAX 1000 IVS
Страница 14: ...REGULATORY INFORMATION NDA 24219 Page xii Revision 2 0 This page is for your notes ...
Страница 20: ...CHAPTER 2 NDA 24219 Page 6 Revision 2 0 2 2 Installation Methods Figure 2 3 Wall Mounting Installation PIM ...
Страница 21: ...NDA 24219 CHAPTER 2 Page 7 Revision 2 0 Figure 2 4 19 Inch Rack Mounting Installation PIM 19 BRACKET H ...
Страница 22: ...CHAPTER 2 NDA 24219 Page 8 Revision 2 0 Figure 2 5 Desktop Installation PIM ...
Страница 142: ...CHAPTER 3 NDA 24219 Page 128 Revision 2 0 This page is for your notes ...