CHAPTER 3 NDA-24219
Page 24
Revision 2.0
2. PROCEDURE
This section explains the procedures for installing the PBX system. The installer should follow the flowchart proce-
dure shown in
. In the flowchart, an NAP (NEC Action Procedure) Number, denoted on the right side of
each action, refers to the details for each procedure.
Figure 3-2 Procedure Flowchart
START
UNPACKING
MARKING AND DRILLING
INSTALLATION OF
CONNECTION OF
TERMINATION OF
CABLES ON MDF
CABLE RUNNING
TO MDF
SWITCH SETTING OF
MAIN EQUIPMENT
BATTERY
CIRCUIT CARDS
A
PWR CA-A AND
BUS CABLE CONNECTION
Содержание NEAX 1000 IVS
Страница 14: ...REGULATORY INFORMATION NDA 24219 Page xii Revision 2 0 This page is for your notes ...
Страница 20: ...CHAPTER 2 NDA 24219 Page 6 Revision 2 0 2 2 Installation Methods Figure 2 3 Wall Mounting Installation PIM ...
Страница 21: ...NDA 24219 CHAPTER 2 Page 7 Revision 2 0 Figure 2 4 19 Inch Rack Mounting Installation PIM 19 BRACKET H ...
Страница 22: ...CHAPTER 2 NDA 24219 Page 8 Revision 2 0 Figure 2 5 Desktop Installation PIM ...
Страница 142: ...CHAPTER 3 NDA 24219 Page 128 Revision 2 0 This page is for your notes ...