57
CHAPTER 6 CONNECTING PERIPHERAL EQUIPMENT
(5) Turn on power
Turn on power in the sequence described below. Turn off power in the reverse sequence. Usually, turn
power on/off in the described sequence.
◊
Procedure
– Power-on sequence
<1> Turn on the power switch of the host machine.
<2> Turn on the power switch of the IE-784000-R.
<3> Start Windows and then the integrated debugger. For details on how to start the debugger,
refer to the User’s Manual for ID78K/IV Integrated Debugger.
Caution If communication with the IE-784000-R cannot be established after the inte-
grated debugger has been started, check the following points:
<1> Is the cable between the IE-784000-R and IE-70000-98N-IF connected cor-
rectly?
<2> Is the connecting cable between the IE-70000-98N-IF and host machine
connected correctly?
<3> Is the setting of the integrated debugger for the IE-70000-98N-IF?
<4> Is the jumper on the emulation board or supervisor board set as described in
APPENDIX C JUMPER SETTING?
<5> Are the break board, emulation board, I/O emulation board, and connector
board correctly mounted to specified positions?
<6> If the target system is connected, be sure that the RESET pin of the target
device is not fixed to the low level.
If the IE-784000-R still cannot be started, consult NEC.
– Power-off sequence
<1> Turn off the power switch of the IE-784000-R.
<2> Turn off the power switch of the host machine.
Содержание IE-784000-R
Страница 2: ...2 MEMO...
Страница 12: ...12 MEMO...
Страница 21: ...21 CHAPTER 1 GENERAL Photo 1 3 Boards a Break board Event trace board Performance board b Supervisor board...
Страница 36: ...36 MEMO...
Страница 38: ...38 MEMO...
Страница 50: ...50 MEMO...
Страница 64: ...64 MEMO...
Страница 72: ...72 MEMO...
Страница 80: ...80 MEMO...
Страница 94: ...94 MEMO...
Страница 100: ...100 MEMO...
Страница 108: ...108 MEMO...
Страница 111: ...111 APPENDIX C JUMPER SETTING Fig C 1 Locations of Jumpers on IE 78000 R SV2 Board 2 2 Component side 4096 1024 JP2 JP1...