![background image](http://html.mh-extra.com/html/nec/express5800-120rd-1/express5800-120rd-1_service-manual_251198028.webp)
8 Service Guide
4.5
Collecting Dump
To dump data, press the dump switch on the rear. The data is dumped into the boot device. Bear in
mind that data cannot be dumped depending on the OS setting.
4.6
Execution of POST
POST is executed when the power is turned on and when the system is reset. If an error is detected,
the error message is usually displayed on the screen. For the contents of error messages, see the User's
Guide.
This server has a POST lamp on the rear that indicates the current item under execution of POST. If the
server stops, be sure to confirm the status of the POST lamp. (See Section 12.2)
4.7
Execution of the T&D Program
Insert the EXPRESSBUILDER CD-ROM provided with the server into the CD-ROM drive, start it, and
select
[Tools]
-
[System Diagnostics]
from the menu to start the T&D program. After that, execute
operation according to the menu.
NOTE:
Be sure to disconnect the LAN cable before executing system
diagnostics. Failure to do so may influence the network.
See the NEC Express5800/100 Series Test and Diagnostic Program Operation Manual for the contents
of error messages, which might be displayed when the T&D program is executed:
Содержание EXPRESS5800/120Rd-1
Страница 1: ... EXPRESS5800 120Rd 1 S e r v i c e G u i d e ...
Страница 3: ...Revision Record Edition COMP Date Page Description 1 0 2003 1 16 First Edition ...
Страница 4: ...II Service Guide ...
Страница 18: ...XVI Service Guide ...
Страница 52: ...32 Service Guide 12 Appendix 12 1 Block Diagram System Block Diagram ...
Страница 53: ...33 Service Guide Power Block Diagram ...
Страница 67: ...47 Service Guide Figure 12 10 CRS Cable xx ...
Страница 68: ......
Страница 69: ......
Страница 70: ... ...