![background image](http://html.mh-extra.com/html/nec/express5800-110ei/express5800-110ei_user-manual_251177111.webp)
Installing the Operating System with Express Setup 5-7
The Flow of Setup
This section visually describes the flow of the setup operated by Express Setup.
Disk Array Configuration *1
↓
Restart
↓
Creating Maintenance Partition
↓
Restart
↓
Installing Utilities
↓
Restart
↓
*2
Creating OS Partition
↓
Restart
↓
Formatting OS Partition
↓
Copying NEC Modules
↓
Copying Selected Application Modules
Read notes and restrictions
Confirmed
Go back
Select how to install
Yes
Insert floppy disk into the floppy disk drive
Confirmed
Select Setup Parameter File
No
Retrieve
again
Existing File
Select OS
New File
Terminate
Check Setup Parameter File
If you need to
reset the
specification
Correct
Confirm the
setting/select whether
or not to modify
Confirm the specification and input the value
Re-select
OK
Incorrect
No
Yes
Insert Windows CD-ROM
After restarting the
computer, the installation
completed
Express Setup
↓
Log on Automatically
: Process that continues automatically
: Process that need to input or select
Agree Software License Agreement
*1 The process is operated only when Disk Array Controller Board is connected and the configuration is
specified.
*2 If you select [Others], the process is completed here.
Содержание Express5800/110Ei
Страница 1: ...N8100 1005F NEC Express5800 110Ei User s Guide 1st Edition 11 2004 ONL 3125aN 110Ei 100 99 0411 ...
Страница 16: ...x This page is intentionally left blank ...
Страница 33: ...General Description 2 5 Rear View 1 2 3 2 4 5 6 7 8 9 10 11 12 ...
Страница 104: ...4 42 Configuring Your Server This page is intentionally left blank ...
Страница 148: ...5 44 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 168: ...6 20 Installing and Using Utilities This page is intentionally left blank ...
Страница 180: ...7 12 Maintenance This page is intentionally left blank ...
Страница 218: ...9 8 Upgrading Your Server Secure the side cover with two screws removed in the removal procedure Screws ...
Страница 270: ...10 14 Internal Cabling Diagrams This page is intentionally left blank ...
Страница 272: ...A 2 Specifications This page is intentionally left blank ...
Страница 314: ...F 4 Product Configuration Record Table This page is intentionally left blank ...