Section 1: Installing the Cabinet
1-2
◆
Section 1: Installing the Cabinet
Aspire S Hardware Manual
Site Requirements
The system can be
fl
oor-mounted (optional
fl
oor mounting brackets required), wall-mounted, or rack-
mounted (rack mounting hardware required). Ensure that enough space is available around the cabinet to
allow room to work with the cabinet for installation and maintenance.
The system requires a three-prong dedicated 110 VAC 60 Hz circuit (NEMA 5-15 receptacle) located within
6 feet of the AC receptacle. Telco should install the RJ21X to the right of the cabinet. Extension blocks
should be installed to the left of the cabinet.
The cabinet is shipped fully assembled. The following is enclosed with the cabinet:
●
1 green 14AWG ground wire (installed to the power supply’s backplane)
●
1 black three-prong power cord (packed outside the cabinet)
Environmental Requirements
Meeting and maintaining established environmental standards maximizes the life of the system. Be sure that
the site selected for the cabinet is not:
1.
In direct sunlight or in hot, cold or humid places.
2.
In dusty areas or in areas where sulfuric gases are produced.
3.
In places where shocks or vibrations are frequent or strong.
4.
In places where water or other
fl
uids comes in contact with the main equipment.
5.
In areas near high-frequency machines or electric welders.
6.
Near computers, telexes, microwaves, air conditioners, TVs, wireless devices, medical instruments, etc.
7.
Near radio antennas (including shortwave).
Removing the Front Cover
1.
Position the cabinet on the
fl
oor near the MDF within 6 feet of the dedicated AC outlet. (Do not
secure the cabinet to the wall at this time).
2.
Loosen the four captive front panel retaining screws.
3.
Lift up slightly on the bottom of the front cover - then gently slide the cover up over the tabs to
remove it.