91
Installing a Common Vent System
9.4 Connecting and Terminating the Vent Pipe
Refer to the following example to install the common vent system. The installation area should be measured
to ensure that sufficient space is available to install the boiler units and the common vent system. Ensure that
the common vent system is installed near the boiler units while satisfying all clearance requirements that are
specified in this manual as well as the Installation Manuals supplied with the boiler units.
9.4.1 Connecting the Main Pipe Runs to Wye Joint or Wye Assembly
After connecting the wye joint or wye assembly, connect the main trunk pipe to each side of the wye joint or wye
assembly. Each trunk pipe is connected to the other wye joint or wye assembly. Refer to “Connecting Pipes with
Cement” on page 85 for more information.
DANGER
If the connections leak, harmful flue gas may cause personal injury or death. After completing the installation
and filling the boiler with water, turn on the water heater and test for leaks using a bubble test kit. After
applying the soap solution, bubbles will form on the connection if any leaks exist.
9.4.2 Installing the System Termination
End caps, pipe elbows or tee joints can be used at the open ends of the intake and exhaust vent pipes. Refer to
the following installation examples that depict how the parts are fitted at the end of the common vent system
piping.
Note
The illustration is intended for reference purposes only.
Содержание NCB-190/060H
Страница 137: ...137 Appendixes 12 6 2 Burner Assembly 12 13 10 20 21 11 7 3 1 2 5 24 6 9 23 22 8 14 19 16 17 10 15 18 4...
Страница 141: ...141 Appendixes 12 6 4 Fan Gas Assembly 10 9 12 8 7 3 1 2 4 5 6 13 11 11 14 15...
Страница 143: ...Memo...
Страница 144: ......