![Navien NCB-190/060H Скачать руководство пользователя страница 81](http://html2.mh-extra.com/html/navien/ncb-190-060h/ncb-190-060h_installation-and-operation-manual_3630061081.webp)
81
Installing a Cascade System
Note
●
To add additional sub water heater
at a later time, repeat step 3.
●
To cancel the cascade
communication settings, on the
main NCB-H boiler panel, press the
Back button (
) and the Menu
button (
) simultaneously for
3 seconds, and then select
“4. Cascade Status and Set”. Then,
select “2. Cascade System Removal”
and select “YES”. The water heaters
will revert to independent operation.
To reassign the main NCB-H boiler,
repeat steps 1-5.
3. On the sub NPE-A2 water heater panel, press
and hold the OK button ( ) for 3 seconds on
the sub unit. Then, the
ID 1. Allocated!
message
will appear on the sub unit’s front panel display.
When the water heater is set to a sub unit, the
icon will appear on the display.
4. Repeat step 3 to configure the rest of the sub
water heaters in the system.
5. On the main NCB-H boiler panel, press the
Command dial (
)
button when the following screen appears. All
the display screens on the configured water
heaters will return to the temperature display.
Содержание NCB-190/060H
Страница 137: ...137 Appendixes 12 6 2 Burner Assembly 12 13 10 20 21 11 7 3 1 2 5 24 6 9 23 22 8 14 19 16 17 10 15 18 4...
Страница 141: ...141 Appendixes 12 6 4 Fan Gas Assembly 10 9 12 8 7 3 1 2 4 5 6 13 11 11 14 15...
Страница 143: ...Memo...
Страница 144: ......