![Navien NCB-190/060H Скачать руководство пользователя страница 36](http://html2.mh-extra.com/html/navien/ncb-190-060h/ncb-190-060h_installation-and-operation-manual_3630061036.webp)
36 Installing the System Piping
3.6.5 System Application - Air Handler System
Air Flow
Air Handler
Make-up Water
NaviClean
(recommended)
Expansion Tank
Pressure Relief Valve
Backflow preventer
Pressure reducing valve
Air Separator
Note
●
System application drawings are intended to explain the system piping concept only.
●
Install a NaviClean filter in the system return to remove foreign objects from the system. Foreign
objects inside the system may result in abnormal system operation.
●
Refer to “3.4 Filling the System” on page 29 for make-up water connections and refer to the
requirements of your local codes to ensure compliance.
●
Air handlers with an internal pump shall be piped either with a crossover pipe at the AHU or in a
primary/secondary configuration with the boiler.
●
Refer to the “3.7.9 Wiring Diagram - Air Handler” on page 49 for wiring connections.
●
You can use a secondary piping configuration for the air handler system to maintain optimal flow
and heat capacity.
Содержание NCB-190/060H
Страница 137: ...137 Appendixes 12 6 2 Burner Assembly 12 13 10 20 21 11 7 3 1 2 5 24 6 9 23 22 8 14 19 16 17 10 15 18 4...
Страница 141: ...141 Appendixes 12 6 4 Fan Gas Assembly 10 9 12 8 7 3 1 2 4 5 6 13 11 11 14 15...
Страница 143: ...Memo...
Страница 144: ......