![Navien NCB-190/060H Скачать руководство пользователя страница 46](http://html2.mh-extra.com/html/navien/ncb-190-060h/ncb-190-060h_installation-and-operation-manual_3630061046.webp)
46 Installing the System Piping
With 24VAC connections
N
A/
H
DH
W
PR
I
L
N
L
N
L
N
L
N
L
Z3
Z2
Z1
SUPPLY
TEMPERATURE SENSOR
RETURN
OUTDOOR
T/S_ZONE3
R
W
C
T/S_ZONE2
R
W
C
T/S_ZONE1
R
W
C
AC24VN
AC24VL
lLWCO
R
W
C
T/
S_Reci
r
COM
NO
NC
ZO
N
E_V/V
3
COM
NO
NC
ZO
N
E_V/V
2
COM
NO
NC
ZO
N
E_V/V
1
SUPPLY
TEMPERATURE SENSOR
RETURN
OUTDOOR
T/S_ZONE3
R
W
C
T/S_ZONE2
R
W
C
T/S_ZONE1
R
W
C
AC24VN
AC24VL
lLWCO
R
W
C
T/S_Recir
COM
NO
NC
ZONE_V/V3
COM
NO
NC
ZONE_V/V2
COM
NO
NC
ZONE_V/V1
Recirculation Timer,
Aquastat,
or HotButton
Push Button
Zone
valve 3
(max. 0.75 A)
Zone
valve 2
(max. 0.75 A)
Zone
valve 1
(max. 0.75 A)
24 VAC N
Thermostat Input
24 VAC L
Thermostat 3
24 VAC N
Thermostat Input
24 VAC L
Thermostat 2
24 VAC N
Thermostat Input
24 VAC L
Thermostat 1
Pump Ground
N
A/H
DHW
PRI
L
N
L
N
L
N
L
N
L
Z3
Z2
Z1
System pump
(max. 2.5 A)
Recirculation pump
(max. 2.5 A)
Note
●
NO (Normal Open): Power is supplied when the zone valve is operating, and power turns off when
the zone valve stops.
●
NC (Normal Close): Power is supplied when the zone valve stops, and power turns off when the
zone valve is operating.
●
COM: 24 V AC COMMON
Содержание NCB-190/060H
Страница 137: ...137 Appendixes 12 6 2 Burner Assembly 12 13 10 20 21 11 7 3 1 2 5 24 6 9 23 22 8 14 19 16 17 10 15 18 4...
Страница 141: ...141 Appendixes 12 6 4 Fan Gas Assembly 10 9 12 8 7 3 1 2 4 5 6 13 11 11 14 15...
Страница 143: ...Memo...
Страница 144: ......