![Nautel NV20LT Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/nautel/nv20lt/nv20lt_installation-manual_3539523055.webp)
NV20LT/NV15LT INSTALLATION MANUAL
COMMISSIONING
VERSION 4.0 2018-02-26
PAGE 2.9.7
Figure 2.9.5: Front Panel User Interface
5.
In local mode (Local LED will be amber, see
Figure 2.9.5
), enable the NV20LT/NV15LT’s RF output
by pressing the
RF On
switch (see
Figure 2.9.5
). The
RF On
status LED should turn amber,
indicating RF power is enabled. The NV20LT/NV15LT should be operating at the output power level
set during the initial setup.
6.
If you have the dual exciter option, make sure the transmitter’s front panel UI has been configured
as detailed in
“Upgrading to Dual Exciter” on page 2.3.5
. See the NV20LT/NV15LT Operations &
Maintenance Manual for detailed information.
7.
If you have the dual LVPS option, make sure the transmitter’s front panel UI has been configured as
detailed in
“Upgrading to Dual LVPS” on page 2.3.6
. See the NV20LT/NV15LT Operations &
Maintenance Manual for detailed information.
8.
Check the four LEDs on the left-hand side of the front panel display. They should all be green,
indicating normal operation. If not, check for alarms by navigating to the front panel’s
Main
Menu
->
View Status
->
View Alarms
screen. See the NV20LT/NV15LT Operations &
Maintenance Manual or the NV20LT/NV15LT Troubleshooting Manual for detailed information.
9.
Set the correct time and date on the front panel by navigating to the front panel’s
Main Menu
->
User Settings
->
Set Clock
screen. See the NV20LT/NV15LT Operations & Maintenance Manual.
Preset 1
Forward Power
RF On
RF Off
Local
Remote
Status LEDs
Switches
Содержание NV20LT
Страница 2: ......
Страница 4: ......
Страница 8: ...NV20LT NV15LT INSTALLATION MANUAL PAGE 2 VIII VERSION 4 0 2018 02 26...
Страница 18: ...NV20LT NV15LT INSTALLATION MANUAL UNPACKING AND POSITIONING PAGE 2 2 8 VERSION 4 0 2018 02 26...
Страница 26: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING OPTIONS PAGE 2 3 8 VERSION 4 0 2018 02 26...
Страница 30: ...NV20LT NV15LT INSTALLATION MANUAL CONNECTING TO STATION REFERENCE GROUND PAGE 2 4 4 VERSION 4 0 2018 02 26...
Страница 36: ...NV20LT NV15LT INSTALLATION MANUAL CONNECTING AC POWER PAGE 2 5 6 VERSION 4 0 2018 02 26...
Страница 42: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING PROGRAM INPUTS PAGE 2 7 4 VERSION 4 0 2018 02 26...
Страница 48: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING CONTROL MONITOR WIRING PAGE 2 8 6 VERSION 4 0 2018 02 26...
Страница 60: ...NV20LT NV15LT INSTALLATION MANUAL COMMISSIONING PAGE 2 9 12 VERSION 4 0 2018 02 26...
Страница 64: ...NV20LT NV15LT INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 10 4 VERSION 4 0 2018 02 26...
Страница 74: ...NV20LT NV15LT INSTALLATION MANUAL PRE INSTALLATION INSTALLATION ASSISTANCE PAGE 2 11 10 VERSION 4 0 2018 02 26...
Страница 76: ...NV20LT NV15LT INSTALLATION MANUAL LIST OF TERMS PAGE 2 12 2 VERSION 4 0 2018 02 26...
Страница 77: ......