NV20LT/NV15LT INSTALLATION MANUAL
UNPACKING AND POSITIONING
PAGE 2.2.2
VERSION 4.0 2018-02-26
6.
Install the RF output connector, which was partially disassembled for shipment, as follows (see
Figure 2.2.4 on page 2.2.6
):
NOTE
: The RF output connector was factory configured prior to shipping.
Remove the output cover packing plate from the RF output connector on top of the
transmitter. The packing plate - along with three spacer plates - is secured using four M6
screws. Remove only the packing plate, leave the spacer plates in place and retain the screws.
Obtain the “Output Stud Plate”, which was tyrapped in the rear of the transmitter. Using the
M6 screws retained above, install the output stud plate on top of the spacer plates. Firmly
tighten M6 hardware. Note that the output stud plate’s studs contain the necessary securing
hardware (nuts, flat washers and split washers) to connect the RF output to a dummy load or
the antenna system in
Section 2.9, “Commissioning”
.
7.
Verify that the RF feed cable reaches the RF output connector on the top of the cabinet. The RF
feed cable will be connected in
Section 2.6, “Installing the RF Feed Cable”
.
8.
Obtain the ac entry box (Nautel Part # 219-8277) and its securing hardware (four M4 screws),
which were bagged and packed with the ancillaries. Install the ac entry box, noting proper
orientation, on top of the transmitter as shown in
Figure 2.2.7 on page 2.2.9
.
9.
Proceed to
Section 2.3, “Installing Options”
to configure your transmitter for any options that were
purchased.
10. Do not re-install the rear panels at this time.
Содержание NV20LT
Страница 2: ......
Страница 4: ......
Страница 8: ...NV20LT NV15LT INSTALLATION MANUAL PAGE 2 VIII VERSION 4 0 2018 02 26...
Страница 18: ...NV20LT NV15LT INSTALLATION MANUAL UNPACKING AND POSITIONING PAGE 2 2 8 VERSION 4 0 2018 02 26...
Страница 26: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING OPTIONS PAGE 2 3 8 VERSION 4 0 2018 02 26...
Страница 30: ...NV20LT NV15LT INSTALLATION MANUAL CONNECTING TO STATION REFERENCE GROUND PAGE 2 4 4 VERSION 4 0 2018 02 26...
Страница 36: ...NV20LT NV15LT INSTALLATION MANUAL CONNECTING AC POWER PAGE 2 5 6 VERSION 4 0 2018 02 26...
Страница 42: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING PROGRAM INPUTS PAGE 2 7 4 VERSION 4 0 2018 02 26...
Страница 48: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING CONTROL MONITOR WIRING PAGE 2 8 6 VERSION 4 0 2018 02 26...
Страница 60: ...NV20LT NV15LT INSTALLATION MANUAL COMMISSIONING PAGE 2 9 12 VERSION 4 0 2018 02 26...
Страница 64: ...NV20LT NV15LT INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 10 4 VERSION 4 0 2018 02 26...
Страница 74: ...NV20LT NV15LT INSTALLATION MANUAL PRE INSTALLATION INSTALLATION ASSISTANCE PAGE 2 11 10 VERSION 4 0 2018 02 26...
Страница 76: ...NV20LT NV15LT INSTALLATION MANUAL LIST OF TERMS PAGE 2 12 2 VERSION 4 0 2018 02 26...
Страница 77: ......