![Nautel NV20LT Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/nautel/nv20lt/nv20lt_installation-manual_3539523032.webp)
NV20LT/NV15LT INSTALLATION MANUAL
CONNECTING AC POWER
PAGE 2.5.2
VERSION 4.0 2018-02-26
8.
With the main ac power cables near terminal block TB1, cut each wire to the required length and
remove 1.9 cm (3/4 in.) of insulation from the end of each conductor.
9.
Connect the main ac power source as follows:
NOTE
: The following tools are required for installation (user provided): 3/16-inch, 1/4-inch hex Allen
keys and a suitable torque wrench to tighten ac input wiring.
For THREE-PHASE AC POWER SOURCES, connect the three ac line inputs to terminals 1A (
L1
),
2A (
L2
) and 3A (
L3
) of terminal block TB1. Connect the ac neutral (as required, such as with ac
power source voltages between 303 and 459 V ac) to terminal 4A (
N
). Connect the ac ground
to terminal 5A. Secure all wires in their respective terminals.
For SINGLE-PHASE AC POWER SOURCES (European/Asian standards), connect the ac line and
neutral inputs to terminals 1A (
L1
) and 2A (
L2/N
) respectively. Connect the ac ground to
terminal 5A. Secure all wires in their respective terminals.
For SINGLE-PHASE AC POWER SOURCES (North American standards), connect the two 110 V
ac lines (neutral not required) to terminals 1A (
L1
) and 2A (
L2/N
). Connect the ac ground to
terminal 5A. Secure all wires in their respective terminals.
Torque securing hardware on TB1-1 through TB1-4 to 31.1 N-m (275in-lbs) using a user-
supplied torque wrench with a 1/4 inch hex bit.Torque securing hardware on TB1-5 (ground)
to 13.6 N-m (120 in-lbs) using a user-supplied torque wrench with a 3/16 inch hex bit.
Re-install the rear cover on the ac entry box (four M4 screws), ensuring the bonding (ground
wire) is not pinched.
Содержание NV20LT
Страница 2: ......
Страница 4: ......
Страница 8: ...NV20LT NV15LT INSTALLATION MANUAL PAGE 2 VIII VERSION 4 0 2018 02 26...
Страница 18: ...NV20LT NV15LT INSTALLATION MANUAL UNPACKING AND POSITIONING PAGE 2 2 8 VERSION 4 0 2018 02 26...
Страница 26: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING OPTIONS PAGE 2 3 8 VERSION 4 0 2018 02 26...
Страница 30: ...NV20LT NV15LT INSTALLATION MANUAL CONNECTING TO STATION REFERENCE GROUND PAGE 2 4 4 VERSION 4 0 2018 02 26...
Страница 36: ...NV20LT NV15LT INSTALLATION MANUAL CONNECTING AC POWER PAGE 2 5 6 VERSION 4 0 2018 02 26...
Страница 42: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING PROGRAM INPUTS PAGE 2 7 4 VERSION 4 0 2018 02 26...
Страница 48: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING CONTROL MONITOR WIRING PAGE 2 8 6 VERSION 4 0 2018 02 26...
Страница 60: ...NV20LT NV15LT INSTALLATION MANUAL COMMISSIONING PAGE 2 9 12 VERSION 4 0 2018 02 26...
Страница 64: ...NV20LT NV15LT INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 10 4 VERSION 4 0 2018 02 26...
Страница 74: ...NV20LT NV15LT INSTALLATION MANUAL PRE INSTALLATION INSTALLATION ASSISTANCE PAGE 2 11 10 VERSION 4 0 2018 02 26...
Страница 76: ...NV20LT NV15LT INSTALLATION MANUAL LIST OF TERMS PAGE 2 12 2 VERSION 4 0 2018 02 26...