![Nautel NV20LT Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/nautel/nv20lt/nv20lt_installation-manual_3539523044.webp)
NV20LT/NV15LT INSTALLATION MANUAL
INSTALLING CONTROL/MONITOR WIRING
PAGE 2.8.2
VERSION 4.0 2018-02-26
Figure 2.8.1: Passing remote/control monitor wiring through ferrite toroids
4.
Punch the appropriate size hole in the desired remote control/monitor entry plate as follows (see
Figure 2.8.2 on page 2.8.4
):
Remove the desired remote control/monitor entry plate from the top of the transmitter, noting
there are two in the front and one in the rear. The rear plate is also used for program input
cables. Each plate is secured using four M4 screws and has a pre-cut, centered 1/4-inch
diameter hole.
Use a chassis punch tool (e.g., Greenlee, etc.) to punch the desired size hole in the selected
remote control/monitor entry plate. Make sure the cables will pass safely through the hole. If
necessary, you can remove the plate completely to gain access to a 2.5-inch diameter hole.
Re-install the remote control/monitor entry plate on top of the transmitter using four M4
screws.
5.
With the rear filter panel removed or the front, hinged panel open, as applicable, route the remote
control/monitor cables through the selected entry hole and then to the controller’s (A4) rear panel
or to the optional remote interface PWB (A16) (see
Figure 2.8.2 on page 2.8.4
).
NOTE
: When routing remote control/monitor and LAN cables through the built-in conduit, consider the
possibility that program cables may also pass through the conduit (see
Section 2.7, “Installing Program
Inputs” on page 2.7.1
).
6.
With the remote control/monitor cables near their destination - either at the top of the remote
interface PWB or at the rear of the controller, cut each wire to the required length, and install
connectors, as necessary.
Remote Control/Monitor Wiring
(to controller or optional remote
interface PWB)
Qty 2
LXP38
ferrite
toroids
Содержание NV20LT
Страница 2: ......
Страница 4: ......
Страница 8: ...NV20LT NV15LT INSTALLATION MANUAL PAGE 2 VIII VERSION 4 0 2018 02 26...
Страница 18: ...NV20LT NV15LT INSTALLATION MANUAL UNPACKING AND POSITIONING PAGE 2 2 8 VERSION 4 0 2018 02 26...
Страница 26: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING OPTIONS PAGE 2 3 8 VERSION 4 0 2018 02 26...
Страница 30: ...NV20LT NV15LT INSTALLATION MANUAL CONNECTING TO STATION REFERENCE GROUND PAGE 2 4 4 VERSION 4 0 2018 02 26...
Страница 36: ...NV20LT NV15LT INSTALLATION MANUAL CONNECTING AC POWER PAGE 2 5 6 VERSION 4 0 2018 02 26...
Страница 42: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING PROGRAM INPUTS PAGE 2 7 4 VERSION 4 0 2018 02 26...
Страница 48: ...NV20LT NV15LT INSTALLATION MANUAL INSTALLING CONTROL MONITOR WIRING PAGE 2 8 6 VERSION 4 0 2018 02 26...
Страница 60: ...NV20LT NV15LT INSTALLATION MANUAL COMMISSIONING PAGE 2 9 12 VERSION 4 0 2018 02 26...
Страница 64: ...NV20LT NV15LT INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 10 4 VERSION 4 0 2018 02 26...
Страница 74: ...NV20LT NV15LT INSTALLATION MANUAL PRE INSTALLATION INSTALLATION ASSISTANCE PAGE 2 11 10 VERSION 4 0 2018 02 26...
Страница 76: ...NV20LT NV15LT INSTALLATION MANUAL LIST OF TERMS PAGE 2 12 2 VERSION 4 0 2018 02 26...
Страница 77: ......