Chapter 2
Installing and Configuring Hardware and Software
2-20
ni.com
Figure 2-17.
Connecting Power to the FieldPoint Bank
Connecting to Field Devices
Refer to the operating instructions for each I/O module to connect the field
devices.
Powering On the FP-1300
Caution
Before powering-on the FieldPoint system, make sure that the FP-1300 and the
CAN port to which it connects are operating at the same baud rate. Also make sure that the
arbitration IDs for the FieldPoint banks are unique on the CAN network.
Plug in each power supply to the FieldPoint bank and to the CAN network.
At power-on, the FP-1300 runs a power-on self test (POST) that takes
several seconds. You should see the
POWER
LED light up. After about
five seconds, the
MODULE STATUS
and
CAN STATUS
LEDS flash
green, then red, and then turn solid green indicating that the FP-1300 is
transmitting messages. If the LEDs do not light up as described here, check
the power supply connections and refer to Appendix A,
FP-1300
FP-AI-110
FP-AO-200
FP-RLY-420
FP-TC-120
15 16 V
31 32 C
V 1
3
2
C 17 18
Separate Power Supply
(Recommended)
Cascaded Power
(Reduces Isolation)
No External
Power Required
Shades of gray indicate
different voltage potentials.
CAUTION: Cascading
power defeats isolation.
Содержание FieldPoint FP-1300
Страница 1: ...FieldPoint TM FP 1300 User Manual FP 1300 User Manual October 2002 Edition Part Number 370593B 01 ...
Страница 12: ......
Страница 34: ......
Страница 36: ......
Страница 42: ...Appendix C Specifications FP 1300 User Manual C 4 ni com ...
Страница 44: ......
Страница 48: ...Glossary FP 1300 User Manual G 4 ni com V V volts VDC volts direct current Vrms volts root mean squared ...
Страница 52: ......
Страница 53: ......