Chapter 2
Installing and Configuring Hardware and Software
©
National Instruments Corporation
2-5
4.
Slide the FP-1300 to the desired position on the DIN rail. When it is in
position, lock it to the DIN rail by pushing the rail clip to the locked
position.
Figure 2-3.
Locking the FP-1300 on the DIN Rail
Connecting Terminal Bases with DIN Rail Mounting
Complete the following steps to connect a terminal base to an FP-1300
network module using DIN rail mounting.
Caution
To avoid damaging the FP-1300 and the terminal bases, make sure that no power
is applied to the system while you install or remove terminal bases.
1.
Mount the terminal base on the DIN rail as detailed in the
section.
2.
Attach the terminal base to the FP-1300 by firmly attaching the local
bus connectors. Be careful not to bend any pins.
3.
To add more terminal bases, install them on the rail and connect their
local bus connectors together. In most cases, a single FP-1300
can support up to nine terminal bases, depending on the power
consumption of the I/O modules. Refer to the
section for more information about power requirements.
4.
Place the protective cover onto the local bus connector of the last
terminal base on the bank. Add the rail locks by sliding them on and
tightening the screws.
Содержание FieldPoint FP-1300
Страница 1: ...FieldPoint TM FP 1300 User Manual FP 1300 User Manual October 2002 Edition Part Number 370593B 01 ...
Страница 12: ......
Страница 34: ......
Страница 36: ......
Страница 42: ...Appendix C Specifications FP 1300 User Manual C 4 ni com ...
Страница 44: ......
Страница 48: ...Glossary FP 1300 User Manual G 4 ni com V V volts VDC volts direct current Vrms volts root mean squared ...
Страница 52: ......
Страница 53: ......