![National Comfort Products CPG41838-U Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/national-comfort-products/cpg41838-u/cpg41838-u_instruction-manual_3358708014.webp)
14
Gas Furnace
Heat Module P/N
14208384
14208385
14208386
14208387
Input (BTU) (NG)
25,000
32,000
43,000
50,000
Output (BTU) (NG)
23,750
30,400
40,850
47,500
Input (BTU) (LP)
25,000
N/A
35,000
50,000
Output (BTU) (LP)
23,750
N/A
33,250
47,500
Max External Static Pressure (in w.c.)
0.4
0.4
0.4
0.4
Temperature Rise (°F)
30 to 60
35 to 65
35 to 65
40 to 70
Blower Speed Setting
Med. Low (4)
Med. Low (4)
Med. High (2)
High (1)
Orifice Size (NG)
51
48
50
47
Orifice Size (LP)
58
N/A
60
56
Nominal Temperature Rise (°F)
45
50
50
55
Allowable Air Temperature Range (°F)
130-160
135-165
135-165
140-170
CO
2
%- Acceptable Range
6 TO 7
6 TO 7
6 TO 7
6 TO 7
CO
1
- Air Free - ppm
0-200
0-200
0-200
0-200
Sensing Cold (in w.c.)
1.3 +/- .1
1.05 +/- .1
1.05 +/- .1
1.05 +/- .1
Stack Temperature (°F)
80-140
80-140
80-140
80-140
Specifications for U-Series Condensing Furnaces
Sequence of Operations for all Gas Heat Models
1. Call for Heat
– The thermostat sends a call for heat therefore energizing the “white” wire
to the control board. The control checks to see that the limit switch is closed and the pressure
switch is open. If the limit switch is open, the control responds as defined in the “Limit Switch
Operation – page 21”. If the pressure switch is closed, the control displays four flashes on
the green LED and waits indefinitely for the pressure switch to open. If the pressure switch is
open, the control proceeds to 2. Pre-purge.
2. Pre-purge
– The control energizes the venter motor and waits up to 240 seconds for the
pressure switch to close. If the pressure switch does not close after 3 attempts, the control
green LED will flash two times and enter a soft lock out. When the pressure switch is proven
closed, the control begins the pre-purge time. If flame is present at any time while in
pre-purge, the pre-purge time is restarted. If a flame is present without a call for heating,
the control responds as defined in “Undesired Flame - page 34”. The control runs the venter
motor for a 30 second pre-purge time, then proceeds to the 3. Ignition Trial Period.
3. Ignition Trial Period
– The control energizes the spark and main gas valve. The venter
motor remains energized. If a flame is sensed during the first 16 seconds, the spark is
de-energized and the control proceeds to 4. Heat Blower On Delay. If a flame has not been
sensed during the first 16 seconds, the control de-energizes the spark output and keeps
the gas valve energized for an additional one second flame proving period. If a flame is not
present after the flame proving period, the control de-energizes the gas valve and proceeds
with an ignition retry as specified in “Ignition Retry – page 15”. If a flame is present, the
control proceeds to the 4. Heat Blower on Delay.
Содержание CPG41838-U
Страница 2: ...2...
Страница 5: ...5 Unit Dimensions Original R22 with Gas Heat A B Series 43...
Страница 6: ...6 Original R22 with Electric Heat A B Series Unit Dimensions...
Страница 7: ...7 Unit Dimensions Original R410A with Gas Heat B C D E Series...
Страница 8: ...8 Unit Dimensions Original R410A with Electric Heat B C D E Series...
Страница 9: ...9 Unit Dimensions U Series R410A 80 Gas Heat...
Страница 10: ...10 Unit Dimensions U Series R410A up to 95 Gas Heat...
Страница 11: ...11 Unit Dimensions U Series R410A Electric Heat...
Страница 19: ...19 Gas Furnace 3 Remove the 11 screws 4 Remove the front furnace baffle...
Страница 46: ...46 Chassis Cooling Section...
Страница 79: ...79...