![MW TOOLS 724563080 Скачать руководство пользователя страница 50](http://html1.mh-extra.com/html/mw-tools/724563080/724563080_manual_1861020050.webp)
50
M1.1.SL300U-SL300UM.NLFREN 28082018
EN
Installation scheme for scissor lift
Picture 16 (The control box can be placed on the left or right)
Picture 17
Platform installation
• Place two lift platforms on the position of the location.
• The bottom of oil cylinder is located in the frontage of machine (the direction
of getting on the vehicle).
• Use fork car or other lifting equipments to lift the platform (picture 17) and
make sure that the safety equipment of machine is both turned on and
locked.
WARNING!
To avoid failure of machine safety equipment, can insert a
wood in the middle part of joint-pole.
Prohibit working beneath the lift when hydraulic system
is not completely equipped with hydraulic oil and take the
action of up and down operations.
When moving the lift platform, adjust the space between
two platforms; make sure that the two platforms are
parallel.
U
U
S
S
E
E
R
R
‟
‟
S
S
M
M
A
A
N
N
U
U
A
A
L
L
V
V
1
1
.
.
0
0
2
2
0
0
1
1
4
4
0
0
6
6
- 14 -
Installation scheme for scissor lift
Equipment basic picture
Picture 16
(The control box can be placed on the left or right)
U
U
S
S
E
E
R
R
‟
‟
S
S
M
M
A
A
N
N
U
U
A
A
L
L
V
V
1
1
.
.
0
0
2
2
0
0
1
1
4
4
0
0
6
6
- 15 -
Platform Installation:
-Place two lift platforms on the position of the location
-The bottom of oil cylinder is located in the frontage of machine (the direction of getting on the vehicle)
-Use fork car or other lifting equipments to lift the platform (
Picture17
) and make sure that the safety
equipment of machine is both turned on and locked.
Picture 17
To avoid failure of machine safety equipment, can insert a wood in the middle part of joint-pole.
Prohibit working beneath the lift when hydraulic system is not completely equipped with
hydraulic oil and take the action of up and down operations.
-When moving the lift platform, adjust the space between two platforms; make sure that the two
platforms are parallel.
Ground bolts installation
The ground bolts installation must start after the expiry date on the maintenance of concert, otherwise, it
will affect the quality of solidity.
-Adjust the parallel of the platform and the distance of two platform as
Picture 18
requires.
-Fix the anchor bolts with a percussion electric drill (percussion drill bit is of 16), drill to 120mm hole and
clean the hole.(
Picture 18)
-Use light hammer to install the ground bolts into the hole (need not install the central expanded nail of
ground bolts, install it after level adjustment.) (
Picture 19)
Picture 18
Picture 19
Picture 20
copyrighted
document
- all
rights
reserved
by
FBC