1.2 Transport
WARNING!
Packing can be lifted or moved by lift trucks, cranes or bridge cranes. In case of slinging, a second
person must always take care of the load, in order to avoid dangerous oscillations.
During loading and unloading operation, goods must be handled by vehicles or ships.
At the arrival of the goods, verify that all items specified in the delivery notes are included. In case of missing parts possible
defects or damage may due to transport operations. If finding missing parts, possible defects or damage due to transport, one
should examine damaged cartons according to the accessories packing list to verify the condition of damaged goods and
missing parts, also the person in charge or the carrier must be immediately informed.
WARNING!
The machine is heavy goods! Don’t take manpower load and unload and transporting way into
consideration, the safety of working is important.
Furthermore, during loading and unloading operation goods must be handled as shown in the
picture 2.
Picture 2 Goods lifted
U
U
S
S
E
E
R
R
‟
‟
S
S
M
M
A
A
N
N
U
U
A
A
L
L
V
V
1
1
.
.
0
0
2
2
0
0
1
1
4
4
0
0
8
8
- 4 -
1.2. Transport:
Packing can be lifted or moved by lift trucks, cranes or bridge cranes. In case of slinging, a
second person must always take care of the load, in order to avoid dangerous oscillations
.
During loading and unloading operation, goods must be handled by vehicles or ships.
At the arrival of the goods, verify that all items specified in the delivery notes are included. In case of
missing parts possible defects or damage may due to transport operations.
If finding missing parts, possible defects or damage due to transport, one should examine damaged
cartons according to
<<Accessories Packing List>>
to verify the condition of damaged goods and
missing parts, also the person in charge or the carrier must be immediately informed.
The machine is heavy goods! Don’t take manpower load and unload and transpor
ting way into
consideration, the safety of working is important
.
Furthermore, during loading and unloading operation goods must be handled as shown in the
picture
. (
Picture 2
)
Picture 2 (Goods-lifted)
1.3.Storage:
-The machine equipment should be stocked in the warehouse, if stocked outside should do the disposal
well of waterproof.
-Use box truck in the process of transport, use container storage when shipping.
-The control box should be placed perpendicularly during the transport; and prevent other goods from
extrusion.
-The temperature for machine storage : -25ºC-- 55ºC
2. Manual introduction
This manual has been prepared for workshop personnel expert in the use of the lift operator and
technicians responsible for routine maintenance fitter.
U
U
S
S
E
E
R
R
‟
‟
S
S
M
M
A
A
N
N
U
U
A
A
L
L
V
V
1
1
.
.
0
0
2
2
0
0
1
1
4
4
0
0
6
6
- 3 -
1. Packing, transport and storage
All packing, lifting, handling, transport and unpacking operations are to be performed exclusively
by expert personnel
.
1.1. Packing:
Standard equipment
:
Accessory box (3# CTN), main and sub beam (1
#
CTN), control box 2# CTN
).
Packing List
Table 1
Packing dimension picture
NO.
Name
Accessory name and quantity
1
Lift Beam
Main beam 1 piece
1
Lift Beam
Sub beam 1 piece
2
Control Box
1 set
3
Accessory box
1 set(details are in the accessories packing list)
Scissor lift(lengthened platforms):1610X650X230
Scissor lift(simple type):1520X650X230
Picture 1
1520
650
230
80
1610
650
230
80
copyrighted
document
- all
rights
reserved
by
FBC