Hardware Preparation and
Installation
Introduction
This chapter includes hardware preparation and installation
directions for the XR900 enclosure. Directions for installing or
replacing the various subassemblies are in the
Removal/Replacement procedures in Chapter 5.
Mounting Options
A Modular VME System can be rack-mounted, mast-mounted (as
in a telecommunications environment) or set up in a floor-standing
pedestal configuration. The system may include multiple chassis
components, which interconnect vertically with a latching
mechanism.
As a member of the Modular VME System, the XR900 is adaptable
to both rack/mast and pedestal installations. For proper airflow
and regulatory compliance, a front bezel is supplied as standard
equipment for the enclosure.
Hardware Preparation
There are a number of items to check or tasks to perform before you
apply power to the enclosure. These items include, but are not
limited to, the items summarized in Table 2-1.
!
Warning
Dangerous voltages, capable of causing death, are
present in this equipment. Use extreme caution when
handling, testing, and adjusting.
Содержание XR900 Series
Страница 1: ...XR900 Series Mass Storage Subsystem User s Manual MCPIOSA UM2 ...
Страница 9: ...x ...
Страница 11: ...xii ...
Страница 43: ...Operating Instructions 3 10 3 ...
Страница 46: ...Front Bezel 4 3 4 Figure 4 1 Bezel Removal 11051 00 9408 BEZEL LOCKS 1 EACH SIDE LATCH BUTTONS 1 EACH SIDE ...
Страница 53: ...Removal Replacement Procedures 4 10 4 Figure 4 4 Drive Module Release Latches 11060 00 9409 ...
Страница 57: ...Parts List and Ordering Information 5 3 5 Figure 5 1 XR900 Series Chassis 11271 00 9503 1 3 2 4 ...
Страница 58: ...Support Information 5 4 5 ...