Getting Started
20
3 Getting Started
3.1
For Your Safety
WARNING:
Use extreme care when installing antennas near power lines.
WARNING:
Use extreme care when working at heights.
WARNING:
The Outdoor Unit (ODU) for the PTP 500 Series Bridge must be properly grounded
to protect against lightning. It is the user’s responsibility to install the equipment in accordance
with Section 810 of the National Electric Code, ANSI/NFPA No.70-1984 or Section 54 of the
Canadian Electrical Code. These codes describe correct installation procedures for grounding the
outdoor unit, mast, lead-in wire and discharge unit, size of grounding conductors and connection
requirements for grounding electrodes. It is recommended that installation of the outdoor unit be
contracted to a professional installer.
WARNING:
The ODU for the PTP 500 Series Bridge must be grounded to a Protective Earth
in accordance with the Local Electrical Regulations.
WARNING:
It is recommended that the supplied Power Indoor Plus (PIDU Plus) – PTP 500
Series is used to power the PTP 500 Series Bridge ODU. The use of other power sources may
invalidate safety approval and affect your warranty.
WARNING:
When using alternate DC supplies (via the PIDU Plus DC in terminals as described
in
“Redundancy and Alternate Powering Configurations”), such as battery-backed
DC power source, the supply MUST comply with the following requirements:
•
The voltage and polarity is correct and is applied to the correct terminals in the PIDU Plus
•
The power source is rated as SELV
•
The power source is rated to supply at least 1A continuously, and
•
The power source cannot provide more than the Energy Hazard Limit as defined by IEC/EN/UL6090,
Clause 2.5, Limited Power (The Energy Hazard Limit is 240VA)
CAUTION:
Users and installers should note that the main power supply is the primary disconnect
device.
CAUTION:
Safety will be compromised if external quality cables are not used for connections
that will be exposed to the weather.
CAUTION:
Safety will be compromised if a different power supply is used than the one supplied
by Motorola as part of the system.
3.2
Welcome
Congratulations on the purchase of the PTP 500 Series Bridge from Motorola. The PTP 500
Series Bridge is the latest innovation in high-speed wireless networking that lets you deploy wireless
networks in areas previously unattainable.
Содержание MOTOWI 4
Страница 1: ...PTP 500 Series User Guide phn 1115 000v001 ...
Страница 74: ...Web Page Reference 74 Figure 37 Save Configuration File Screen ...
Страница 100: ...Web Page Reference 100 Figure 59 Spectrum Management as seen from the Master ...
Страница 108: ...Web Page Reference 108 Figure 66 Spectrum Management Master Screen With Operational Restrictions ...
Страница 112: ...Web Page Reference 112 Figure 68 Remote Management ...
Страница 165: ...Data Rate Calculations 165 Figure 112 QPSK 0 50 Single Payload Figure 113 QPSK 0 75 Single Payload ...
Страница 166: ...Data Rate Calculations 166 Figure 114 16 QAM 0 50 Single Payload Figure 115 16 QAM 0 75 Single Payload ...
Страница 167: ...Data Rate Calculations 167 Figure 116 64 QAM 0 67 Single Payload Figure 117 64 QAM 0 83 Single Payload ...
Страница 168: ...Data Rate Calculations 168 Figure 118 256 QAM 0 75 Single Payload Figure 119 QPSK 0 50 Dual Payload ...
Страница 169: ...Data Rate Calculations 169 Figure 120 QPSK 0 75 Dual Payload Figure 121 16 QAM 0 50 Dual Payload ...
Страница 170: ...Data Rate Calculations 170 Figure 122 16 QAM 0 75 Dual Payload Figure 123 64 QAM 0 67 Dual Payload ...
Страница 171: ...Data Rate Calculations 171 Figure 124 64 QAM 0 83 Dual Payload Figure 125 256 QAM 0 75 Dual Payload ...
Страница 197: ...Glossary 197 UTP Unshielded Twisted Pair VLAN Virtual Local Area Network ...