The cable should be assembled as shown in
:
Figure 17
Correct Cable Preparation for the Recommended Cable
Both ends of the ODU cable are terminated in the same way. The above procedure should be
repeated for the PIDU Plus end of the cable when the cable routing process is complete. This
assumes that the installation uses PTP LPUs. If not, then the PIDU Plus end of the cable does
not require a Gland, but just the RJ45.
NOTE:
The PIDU Plus end of the cable does not use a cable gland.
Содержание MOTOWI 4
Страница 1: ...PTP 500 Series User Guide phn 1115 000v001 ...
Страница 74: ...Web Page Reference 74 Figure 37 Save Configuration File Screen ...
Страница 100: ...Web Page Reference 100 Figure 59 Spectrum Management as seen from the Master ...
Страница 108: ...Web Page Reference 108 Figure 66 Spectrum Management Master Screen With Operational Restrictions ...
Страница 112: ...Web Page Reference 112 Figure 68 Remote Management ...
Страница 165: ...Data Rate Calculations 165 Figure 112 QPSK 0 50 Single Payload Figure 113 QPSK 0 75 Single Payload ...
Страница 166: ...Data Rate Calculations 166 Figure 114 16 QAM 0 50 Single Payload Figure 115 16 QAM 0 75 Single Payload ...
Страница 167: ...Data Rate Calculations 167 Figure 116 64 QAM 0 67 Single Payload Figure 117 64 QAM 0 83 Single Payload ...
Страница 168: ...Data Rate Calculations 168 Figure 118 256 QAM 0 75 Single Payload Figure 119 QPSK 0 50 Dual Payload ...
Страница 169: ...Data Rate Calculations 169 Figure 120 QPSK 0 75 Dual Payload Figure 121 16 QAM 0 50 Dual Payload ...
Страница 170: ...Data Rate Calculations 170 Figure 122 16 QAM 0 75 Dual Payload Figure 123 64 QAM 0 67 Dual Payload ...
Страница 171: ...Data Rate Calculations 171 Figure 124 64 QAM 0 83 Dual Payload Figure 125 256 QAM 0 75 Dual Payload ...
Страница 197: ...Glossary 197 UTP Unshielded Twisted Pair VLAN Virtual Local Area Network ...