24
Installation
AVERTISSEMENT : Risque de décharge électrique
N’utilisez qu’un câble de communication 300 V homologué UL.
Connect the appropriate network cables to the TriStar MPPT at this time. Access to the network
ports is easier before the power cables are attached. The ports are located inside the conduit wir-
ing box on the lower circuit board as shown in
fi
gure 3-5.
Figure 3-5. TriStar MPPT network port locations
EIA-485 Connection
The four (4) position EIA-485 connector on the TriStar MPPT must be removed to access the
terminal screws. Remove the socket connector by
fi
rmly grasping the connector body and pulling
away from the circuit board as shown in
fi
gure 3-6.
Figure 3-6. Removing the RS-485 socket connector
Содержание TriStar TS-MPPT-30
Страница 2: ...Dimensions in Inches Millimeters...