![Morningstar TriStar MPPT 600V Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/morningstar/tristar-mppt-600v/tristar-mppt-600v_installation-and-operation-manual_1834372014.webp)
14
Getting Started
19 - Solar Terminal Bridge (yellow)
Isolates high voltage PV wiring from low voltage wiring area
20 - (+) and (-) Solar Power Terminals (pre-wired)
(+) and (-) solar terminal connection points
Optional TS-MPPT-60-600V-48-DB-TR-GFPD Box
21 - Breaker Mounting Plate (removable)
Pre-wired and mounted GFPD sensor and breaker assembly
22 - Ganged Ground-fault Breakers
(+) and (-) leg ground-fault interruption breakers
23 - (+) and (-) Solar Breaker Post Connections [(pre-wired),(underside)]
Connection points for (+) and (-) solar wires
24 - Solar Wiring Aperture
Sensing opening for GFPD control
25 - Auxilliary DIN Rail Mount
Available for DIN mountable equipment
26 - Grounding Terminal Block
A chassis terminal for system grounding
27 - Test / Reset Button
Performs testing and reset functions
28 - Bi-Color LED
Indicates various fault and alarm conditions
29 - GFPD Control and Power Terminals
Terminal connections for GFPD signals and power.