3.0
Installation and Commissioning
26
GenStar MPPT
27
START-UP BEHAVIOR
RTS REQUIRED - YES
(default setting)
RTS REQUIRED - NO
(default must be changed in
factory reset-new commissioning)
RTS not connected at start-
up
Fault - no charging
Normal charging using 25°C
RTS connected at start-up
Normal charging using RTS
temperature
Normal charging using RTS
temperature
RTS REQUIRED - YES
(default setting)
RTS REQUIRED - NO
(default must be changed in
Installer Setup)
RTS disconnected
Fault - no charging
CONTINUED CHARGING AT
25°C ref. - ALARM SET
RTS reconnected
Clears fault, then normal
charging using RTS temperature
Normal charging using RTS
temperature
RUN-TIME BEHAVIOR
Table 3-3. GenStar MPPT Start-up Behavior
Table 3-4. GenStar MPPT Run-time Behavior
RTS START-UP and RUN-TIME BEHAVIOR TABLES
12V, 24V or
48V
BMS
Block?
Battery
Charging
Profile
1
“RTS Required”, is the default setting. Once a unit is
commissioned with this default, a subsequent change to,
“RTS not required”, necessitates that the unit be
re-commissioned via a Factory Reset using the local
meter - Installer Setup\Commands\Factory Reset.
Also see RTS Start-up and Run-time Behavior Tables
below.
Select
Battery
Model
LVD-LVR
Profile
LVD-LVR
Profile
RTS
Required?
1
Local Time
Offset
Set UTC-
Time
YES
NO
SKU-HW-
SW Versions
Language
Ethernet
Writes?
MSC
Logo
Initial
Power-up
The commissioning flowchart in Figure 3-6 below illustrates the selectable options required to
prepare the GenStar MPPT for operation or further programming.
Figure 3-6 -Commissioning Flowchart