background image

38

 

 

 

MAINTENANCE 

 

 

Before  performing  any  maintenance  procedures  on  the  stove,  follow 

these precautions:

 

 

-

  Wait until all parts of the stove are cold.

 

 

-

  Wait until the ashes are completely off.

 

 

-

  Make sure that the switch is in the 

0

“ 

position.

 

 

-

  Make sure that the power cable has been disconnected from the main 

power supply.

 

 

PLEASE  FOLLOW  CAREFULLY  THE  FOLLOWING  CLEANING  IN-

STRUCTIONS!

 

 

MORETTI  DESIGN  IS  NOT  RESPONSIBLE  FOR  DAMAGE  TO  PEO-

PLE,  ANIMALS  OR  THINGS  CAUSED  BY  A  NON

-

COMPLIANCE  OF 

THE FOLLOWING INDICATIONS. 

 

 

In addition to the annual maintenance that must be carried out by author-

ized personnel, frequent cleaning procedures such as cleaning the burn-

er,  emptying  the  ash  drawer  and  cleaning  the  tube  bundle  should  be 

carried out.

 

 

Cleaning the burner

 

 

It is necessary to check if the burner is clean, that there are no combus-

tion residuals or if the air ports are not obstructed. All this to avoid that 

the stove does not perform a poor combustion and to avoid overheating 

which  could  cause  damage  to  the  stove

s  painted  surfaces  or  a  failed 

ignition of the flame. 

 

 

While  the  hydro  stove  is  in  operation,  residues  can  form  in  the  burner 

that must be removed before switching on again. The amount of ashes 

left over in the burner depends on the type of pellet used, even the same 

type of fuel from  different bags of a the same brand can have different 

outcomes when burnt.

 

 

Automatic burner cleaner

 

 

The PLUS CLEAN models are equipped with an automat-

ic  burner  cleaning  system  that  activates  during  the  first 

phase of the ignition of the hydro stove. This function can 

also be deactivated.

 

 

Emptying the ash drawer

 

 

The  ash  drawer  is  located  inside  the  combustion  cham-

ber. To access it, open the door, pull the drawer out and 

then vacuum all ash deposits. For the PLUS CLEAN mod-

els,  after  consuming  more  than  80  bags  of  pellets,  the 

drawer can be simply emptied once. The bottom  inspec-

tion  compartment  should  be  opened  at  least  once  a  month  in  order  to 

vacuum all combustion residuals.

 

 

Cleaning the tube bundle 

 

(see dedicated manual)

 

 

The  wiper  can  be  accessed  through  the  handle  and 

moved according to the direction the arrows are pointing, 

repeat the movement at least four times. During the oper-

ation  you  will  notice  a  small  amount  of  dust/ash  falling 

from  the  top  of  the  combustion  chamber.  This  operation  must  be  per-

formed weekly.

 

 

Automatic heat exchanger cleaning

 

 

Some  models  are  equipped  with  an  automatic  heat  ex-

changer cleaning system (AUTO CLEAN) that is activated 

during the first phase of the ignition of the hydro stove.

 

 

 

Cleaning the pellet tank

 

 

Monthly  empty  the  pellet  tank  and  vacuum  all  pellet  dust  residuals  de-

posited at the bottom.

 

 

Cleaning the surfaces

 

 

Use  a  rag  soaked  with  water  for  cleaning  the  painted  metal  surfaces. 

The  use  of  detergents  or  aggressive  diluents  can  damage  the  stove

surfaces.

 

 

 

 

 

 

To ensure that the hydro stove always has an optimal combustion 

and  to  avoid  malfunctions,  frequent  cleaning  operations  must  be 

carried out. The frequency of these operations may vary according 

to the time of use of the stove and quality of the pellets.

 

 

To  avoid  the  water  from  freezing  in  the  plumbing  system,  it  is  re-

commended to not disconnect the electrical power from the hydro 

stove, if the water temperature drops to 5 °C, it automatically activa-

tes the pump to prevent freezing.

 

 

An  overall  accurate  maintenance  check  up  of  the  stove  must  be 

carried  out  annually,  and  this  must  be  performed  by  a  qualified 

technician.  The  stove  must  be  kept  in  such  a  way  as  to  preserve 

conditions that ensure safety and efficiency.

 

 

WARRANTY

 

 

Warranty certification

 

 

Thanking  you for choosing  our  product,  MORETTI  DESIGN  invites  you 

to consult the user manual and to read the following warranty conditions 

The manufacturer provides the customer with a 24 month period warran-

ty  over  the  product,  that  starts  from  the  date  of  purchase.  In  order  to 

enable the warranty, the client must send the 

warranty certificate 

to the 

manufacturer  headquarters,  completely  filled  in,  within  8  days  from  the 

date of purchase and must keep a copy as proof of the purchase. It must 

be sent to the following address:

 

 

Moretti Fire s.r.l. –

 

C.da Tesino, 50 

-

 63065 Ripatransone (AP) ITALY

 

 

or via e

-

mail: 

[email protected]

 

 

A non received or incomplete warranty card voids the warranty.

 

 

Warranty conditions

 

 

The warranty is limited and only covers manufacturing defects.

 

 

Components not covered by warranty:

 

 

    Ceramic glass

 

    Door seals

 

    Paint

 

    Handles

 

    Knobs

 

    Majolica coating

 

    Metal coating

 

    Ignition resistance

 

    Fuses

 

    Combustion chamber parts

 

    Wearing parts

 

    The burner

 

 

The warranty does not cover damage caused by:

 

 

No first ignition and testing procedure carried out by a qualified technical 

assistance centre (

expense on the client

s behalf

).

 

 

Installation performed by non professional personnel and not in compli-

ance with standard regulations or used in a different manner than that it 

was designed for.    

 

 

Electrical  overloads  caused  by  lightening  or  non  conformed  electrical 

sockets.

 

 

Transport and tampering by unauthorized personnel.

 

 

The non application at least once a year of cleaning and routine mainte-

nance  procedures  of  the  product  by  a  qualified  authorized  servic 

(

expense on the client

s behalf

).

 

 

The use of cheap/poor quality fuel or any other material that can damage 

the product.

 

 

Any  damage  caused  by  an  improper  installation  and/or  disattention  of 

the user.

 

 

The following interventions are not considered under warranty:

 

 

Interventions to adjust combustion parameters.

 

 

Interventions to repair damaged parts caused by poor maintenance.

 

 

EXCLUSION OF LIABILITY

 

 

Failure  to  comply  with  the  operating  conditions  and  decadence  of  the 

warranty will result in the exclusion of the manufacturer from all liability 

for any damage to the customer to animals and other people.  

 

 

EN

 

Содержание ALADINO

Страница 1: ...1 USER MANUAL Installation use and maintenance ALADINO CLESSIDRA ELEGANCE ERGONOMIC PRESTIGE TURBO TOP TURBO GLASS TURBO COMPACT VISION SLOT VISION DOLBY TECNIKA FOR HOME TECNIKA GLASS 2022 AQUA Off...

Страница 2: ...tting COMBUSTION Automatic combustion regulation by FCS Calibration FIRE PROTECTION TOUCH DISPLAY RADIO DISPLAY Introduction Button description OPERATING STATUS Check Up Ignition Normal Modulation Com...

Страница 3: ...horough reading of the user and maintenance manual and scru pulously observe the indications and signs located on the hydro stove The plug of the power cable must be connected only AFTER the installa...

Страница 4: ...ation in small rooms or bedrooms can take place only if the stove is her metic hermetic system and air required for the combustion must be drawn directly from the outside through a tube All local regu...

Страница 5: ...CURVE PROTECTION CAP INSULATED FLUE ASH DEPOSIT IN THE CURVE CHIMNEY FLUE INSIDE AN OLD CHIMNEY CORRECT INSTALLATION CHIMNEY WITH COVER PLATE INSULATION OPEN 45 CURVE OLD CHIMNEY FLUE T WITH INSPECTIO...

Страница 6: ...the boiler straight under the power connector it has a two pin connector coupling with two buttons one black and one red The connection to the thermo stat assures the function that the boiler can go i...

Страница 7: ...a properly sized system to dispose of the power generated by the appliance For the sizing of the system it is recommended to rely on a thermo technician To dissipate excess heat the boiler must be co...

Страница 8: ...to check the quality of the flame by comparing it to the images in the examples above since certain conditions of use and installation could in any case lead to machine malfunctions In any case in th...

Страница 9: ...used to avoid them Owners managers and users of buildings and facilities must ensure the safety of people animals and objects Owners managers and users of buildings and facilities are responsible for...

Страница 10: ...h your finger and swipe vertically Press to Confirm Press to Cancel Press to Edit Press to go back to the previous page Press to go back to the Homepage To unlock the standby screen press on the displ...

Страница 11: ...eful Hydraulic System Configuration P26 2 3 10 11 are active The Maximum value can be programmed by setting Thermostat Th83 Delivery Thermostat It can be viewed if the Return Delivery Probe and the us...

Страница 12: ...e or deactivate the automatic burn pot cleaning system this process takes place during the ignition phase It is recommended to keep it activated Mixing Valve It appears only if an output is configured...

Страница 13: ...ect the day of the week you want to program press on the on off times and scroll up or down to change them There are 3 time slots for each day Brightness Minimum Brightness Standby display Control pan...

Страница 14: ...ed with a and the rela tive error code Select between the periods Monday Friday and Saturday Sunday There are 3 phases for Monday Friday and 3 phases for Saturday Sunday The three types of programs ar...

Страница 15: ...seconds P6 Decrease power Scroll through Menu Decrease parame ter values DESCRIPTION OF THE MENUS The boiler is equipped with various functions available in the individual programming menus Some of th...

Страница 16: ...es use the keys P4 and P6 to increase or decrease the value and confirm the setting by pressing P3 Press P1 to exit the menu Chrono This menu allows you to set the switch on and switch off time slots...

Страница 17: ...ch on the boiler using the Chrono function Tuesday Wednesday Thursday Friday Monday Weekly senai Week end Daily Monday ON OFF 00 00 00 00 V 00 00 00 00 00 00 00 00 Mon Sun ON OFF 00 00 00 00 V 00 00 0...

Страница 18: ...lows you to read the system error list Attention to be used only by an authorized MORETTI DESIGN techni cian Auger Calibration This item allows you to adjust auger rotation speed Attention to be used...

Страница 19: ...Room Temperature measured by the remote Chrono Activation Current time Descrizione Tasti Tasto Funzione Descrizione Sleeping Mode By pressing the button when the main screen is displayed the radio dis...

Страница 20: ...t is possible to change the combustion power level at any time but the change is effective only during Normal mode The power level ranges from 1 to 5 Increasing the power level increases the pellet co...

Страница 21: ...e items of the menu use the keys To confirm the data press SET To exit press ESC Daily Select the day of the week you want to program and set the switch on and switch off times There are 3 time slots...

Страница 22: ...T Recipe Power Thermostats Chrono Settings Informations Radio Standby Menu to switch off the radio display completely To switch on the radio display again To reactivate the remote control press first...

Страница 23: ...t Key Tone Date and Time Secondary Information This menu allows you to view some of the system operating para meters To scroll through the menu use the keys press ESC to exit Radio Test This menu allo...

Страница 24: ...ower Thermostats Chrono Information Settings Service WiKey Thermostat Secondary Information Radio Test Change Code Reset Cleaning Screw Feeder Calibra Screw Feeder Calibration Max 7 Set 0 Min 7 Automa...

Страница 25: ...e available values E g 1 2 3 Minimum Average Maximum After 3 seconds the value is saved and the normal display reappears WIFI CONFIGURATION To configure thermo stoves equipped with a WiFi module it is...

Страница 26: ...If the domestic hot water kit is installed it is not necessary to change the setting on the hydro stove Connections on the control unit Connections on the heating system the following figure is only...

Страница 27: ...s the hydro stove Boiler Probe S the hydro stove Pump P1 Valve P2 Boiler Puffer Probe S3 Electrovalve P2 17 towards heating system 18 towards domestic hot water Probe ACS DHW S3 17 vers l installation...

Страница 28: ...tem includes the hydro stove Boiler Probe S1 the hydro stove Pump P1 Boiler Puffer Probe S1 the heating system pump Pump P2 Probe Puffer Boiler S1 Probe Puffer Boiler S1 Pump P2 For models ALADINO ELE...

Страница 29: ...s only illustrative The system includes the hydro stove Boiler Probe S1 the hydro stove Pump P1 Boiler Puffer Probe S1 the heating system pump Pump P2 For models ALADINO ELEGANCE CLESSIDRA ERGONOMIC C...

Страница 30: ...uffer Probe S1 Electrovalve P2 DHV probe S3 17 towards heating system 18 towards domestic hot water Electrovalve Probe S1 Puffer Boiler Pump P3 For models ALADINO ELEGANCE CLESSIDRA ERGONOMIC COMPACT...

Страница 31: ...Pump P1 heating system Pump P3 Puffer Probe S1 Electrovalve P2 DHV probe S3 Electrovalve P2 Probe S1 Puffer Boiler Pump P3 17 towards heating system 18 towards domestic hot water For models ALADINO EL...

Страница 32: ...be installed according to standard regulations and directions contained in this manual PRESSURE SWITCH BROKEN Unblock and turn on the stove if the error occurs immediately it is likely that the pressu...

Страница 33: ...echnician Er11 The error occurs due to problems with the internal clock CLOCK ERROR Turn off the main switch reset the time and date page 11 then unblock If the error persists replace the battery on t...

Страница 34: ...front door or open pellet door FRONT DOOR OR PELLET DOOR OPEN FOR MORE THAN 120 SE CONDS Unlock and check if the doors have been closed correctly If the error persists contact an authorised technician...

Страница 35: ...IN11 Input IN12 Input IN11 Storage Tank Probe Flowmeter Room Thermostat OPTIONAL Limit Switch Micro Burn Pot Cleaning ALL CLEAN MODELS ONLY Flowmeter Sensor Pressure Sensor Combustion Fan Encoder Wat...

Страница 36: ...35 Remote Control Cod PSYSI04000005 Off Output to be configured Output to be configured Output to be configured Output to be configured ELECTRONIC CONTROL UNIT Code PSYSS04000003 EN...

Страница 37: ...I FI 4HEAT system Code PSYSF09000002 EN LINE Combustion Fan Burn Pot Cleaning Motor Tube Bundle Cleaning Motor Spark plug Screw Feeder Safety Thermostat Pressure Switch Pump Tube Bundle Cleaning Motor...

Страница 38: ...e Exaust Probe 32 Rosso 33 IN2 Auger Motor Encoder 34 GND 35 IN3 Micro Switch Pellet door and Front door 36 GND 37 IN4 Water probe 38 GND 39 IN5 Encoder Sensor Exaust Ventilator 40 GND 41 V 42 Vc Flow...

Страница 39: ...e diluents can damage the stove s surfaces To ensure that the hydro stove always has an optimal combustion and to avoid malfunctions frequent cleaning operations must be carried out The frequency of t...

Страница 40: ...EV 07 2022 ENG Moretti Fire s r l ITALY www morettidesign it The Moretti fire s r l assumes no responsibility for any errors in this manual and the right to modify without notice features of its produ...

Отзывы: