5
Module Preparation
1.
Place fuses into the control module.
A. Observe fuse amperage ratings.
Place the 5 Amp fuse into the
“Main B+” location. Populate the
remaining fuse locations, as
shown in the diagram, with the 15
Amp fuses. Make sure to populate
The 15 amp fuse with the “open”
fuse label on the module.
2.
Install DNA into the control module.
A. Insert DNA into the control module.
Ensure the DNA assembly snaps
completely in place.
DNA
123
123
123