Start Up
12
B : Operator Check list
It is the owner / drill operators responsibility to set up the drill for:
1. Sowing depth according to conditions in each soil type and pre worked condition
2. Tramline bout number to suit tramlines
3. Tramline
track
width
4. Number of rows shut off whilst tram lining
5. Marker width setting to allow matching of bouts
6. Operation of half width shut off
7. Folding the machine in and out of work without damage
It is also the owner / operator’s responsibility to check the operation of the various
functions of the machine between each hopper fill, or at least once every hour to check the
machine is operating correctly.
Содержание Tandem Uni-Drill DP400A
Страница 9: ...Safety Regulations Safety Stickers 9 ...
Страница 17: ...Start Up G TURBINE 17 ...
Страница 23: ...Settings A Distribution Settings 23 ...
Страница 32: ...Settings H Tramline Track Width 32 ...
Страница 41: ...Flow Rate Tables Calibration Procedure 41 ...
Страница 42: ...Flow Rate Tables Calibration Procedure 42 ...
Страница 43: ...Flow Rate Tables Calibration Procedure 43 ...
Страница 44: ...Flow Rate Tables Calibration Procedure 44 ...
Страница 45: ...Flow Rate Tables Calibration Procedure 45 ...
Страница 48: ...DP400A and DP600A Parts booklet 2002 seeding line ...
Страница 52: ...2002 DP600A markers ...
Страница 54: ...Marker Circuit Diagram ...
Страница 55: ...W Seed box hopper extension ...
Страница 56: ...W Seed box Peg Wheels ...
Страница 57: ...W Seed box Distributor Assembly ...
Страница 58: ...W Seed box Distributor Assembly ...
Страница 59: ...W Seed box Variator Assembly W Seed box Variator Assembly ...
Страница 60: ...W Seed box half width shut off ...
Страница 61: ...W Seed box Venturi System ...
Страница 62: ...W Seed box Drive Wheel Assy ...
Страница 63: ...W Seed box Wind turbine Assy ...
Страница 64: ...W Seed box Air Intake ...
Страница 65: ...W Seed box RDS system ...
Страница 66: ...W Seed box MS Variable seeding ...