Contents
10
Start Up Pages
A Technical
Specifications
11
B
Operator Check List
12
C Hitching
13
D Transport
14
E Hydraulic
Connections
15
F Hopper
Cover
16
G
Turbine
17 - 19
Settings
A
Distribution
20 - 25
B Sowing
Depth
26
C Weight
Transfer
27
D Coulter
Adjustment
28
E Markers
29
F
Half Width Shut Off
30
G Electronic
Tramlines
31
H
Tramline Track Width
32
Maintenance
A Wear
Check
33
B Seed
Distribution
34
C
Greasing and Lubrication
35
Optional Equipment
A Multiplier
36
B Flexible
Agitator
37
C
Pre Emergence Marker
38
D Moore
Headland
Control
38-46
Practical Recommendations 47 – 48
Flow Rate & Calibration Procedure 49 - 55
Warranty 55 - 56
Содержание Tandem Uni-Drill DP400A
Страница 9: ...Safety Regulations Safety Stickers 9 ...
Страница 17: ...Start Up G TURBINE 17 ...
Страница 23: ...Settings A Distribution Settings 23 ...
Страница 32: ...Settings H Tramline Track Width 32 ...
Страница 41: ...Flow Rate Tables Calibration Procedure 41 ...
Страница 42: ...Flow Rate Tables Calibration Procedure 42 ...
Страница 43: ...Flow Rate Tables Calibration Procedure 43 ...
Страница 44: ...Flow Rate Tables Calibration Procedure 44 ...
Страница 45: ...Flow Rate Tables Calibration Procedure 45 ...
Страница 48: ...DP400A and DP600A Parts booklet 2002 seeding line ...
Страница 52: ...2002 DP600A markers ...
Страница 54: ...Marker Circuit Diagram ...
Страница 55: ...W Seed box hopper extension ...
Страница 56: ...W Seed box Peg Wheels ...
Страница 57: ...W Seed box Distributor Assembly ...
Страница 58: ...W Seed box Distributor Assembly ...
Страница 59: ...W Seed box Variator Assembly W Seed box Variator Assembly ...
Страница 60: ...W Seed box half width shut off ...
Страница 61: ...W Seed box Venturi System ...
Страница 62: ...W Seed box Drive Wheel Assy ...
Страница 63: ...W Seed box Wind turbine Assy ...
Страница 64: ...W Seed box Air Intake ...
Страница 65: ...W Seed box RDS system ...
Страница 66: ...W Seed box MS Variable seeding ...