Settings
24
A: Distribution Settings
Carrying out the calibration test
1) Fixed unit test
1
Set the distribution as indicated in the manual (plugs, baffle, plate, shutters etc.).
2
Put the grain in the seed box
on the day of sowing
(5 kg of rape, 150 kg of cereal) and carry
out the following test.
3
Set
the variator to the mark indicated in the table (see flow rate table and calibration).
4 Start
distribution: a
minimum
of
25 turns
of the crank (the trough may be filled), or
100 turns
for rape.
5 Carry
out
the test by completing the appropriate number of turns for the width of the seed drill.
N B
Turn steadily at
1 turn per second.
6
Weigh
the quantity collected in the trough using accurate scales.
7
Multiply by 40
to obtain the quantity per hectare or use the calculator (see next page).
8 Correct
the variator setting (lower the lever completely then bring it back up to the required
value).
9 Reset
the area meter to zero after the calibration test.
10
The most representative test is one carried out under real working conditions.
After sowing a hectare, carry out a further check (proceed as above from step
5
).
Checking the distribution system
Distribution of seed to the seed tubes should be checked at regular intervals through out the day, for
example every hour.
•
Check both sides of the drill appear to be delivering the same amount of seed to each coulter.
•
Manually turn the drive wheel with the fan running to ensure seed is blown out of each coulter.
•
Engage tramline mechanism and repeat the above procedure, Note the voltage the tramline system
receives from the tractor affects the way in which the tramline will work
. IF THE TRACTOR IS
SUPPLING AN INVERSE POLARITY VOTAGE TO THE TRAMLINER, THE TRAMLINE
MECHANISM WILL WORK IN THE OPPOSITE MANNER ,i.e TRAMLINE WHEN IT SHOULD’NT
AND NOT TRAMLINE WHEN IT SHOULD
•
When calibrating the seed box check each side of the drill is delivering the right amount of seed.
Содержание Tandem Uni-Drill DP400A
Страница 9: ...Safety Regulations Safety Stickers 9 ...
Страница 17: ...Start Up G TURBINE 17 ...
Страница 23: ...Settings A Distribution Settings 23 ...
Страница 32: ...Settings H Tramline Track Width 32 ...
Страница 41: ...Flow Rate Tables Calibration Procedure 41 ...
Страница 42: ...Flow Rate Tables Calibration Procedure 42 ...
Страница 43: ...Flow Rate Tables Calibration Procedure 43 ...
Страница 44: ...Flow Rate Tables Calibration Procedure 44 ...
Страница 45: ...Flow Rate Tables Calibration Procedure 45 ...
Страница 48: ...DP400A and DP600A Parts booklet 2002 seeding line ...
Страница 52: ...2002 DP600A markers ...
Страница 54: ...Marker Circuit Diagram ...
Страница 55: ...W Seed box hopper extension ...
Страница 56: ...W Seed box Peg Wheels ...
Страница 57: ...W Seed box Distributor Assembly ...
Страница 58: ...W Seed box Distributor Assembly ...
Страница 59: ...W Seed box Variator Assembly W Seed box Variator Assembly ...
Страница 60: ...W Seed box half width shut off ...
Страница 61: ...W Seed box Venturi System ...
Страница 62: ...W Seed box Drive Wheel Assy ...
Страница 63: ...W Seed box Wind turbine Assy ...
Страница 64: ...W Seed box Air Intake ...
Страница 65: ...W Seed box RDS system ...
Страница 66: ...W Seed box MS Variable seeding ...