Page 5
XG0128
M38ODV-ST Direct Vented Fireplace
Installing Terminations with Built-In Frames
PTO-3
PTO-3F
Installing Terminations with MSR Frames
12
12
1. Frame the termination opening to 12" x 12".
2. Fasten the termination to the studs using a minimum of 4 screws.
11
11
1.
Frame the termination opening to 11" x 11".
2.
Fasten the termination to the studs using a minimum of 4
screws.
Installation
Installing Terminations with MOSR Frames
12
12
12
MOSR
1.
Frame the termination opening to 12" x 12".
2.
Fasten the MSR frame to the interior side of the studs using a
minimum of 4 screws.
3.
Insert the termination into the MSR frame as shown here, and
attach by screwing through the four pilot holes in the termination.
PTKOG
1.
Ensure that the two
long
mounting brackets are facing the
bottom of the termination. (See inset). This will provide more
heat protection at the top of the termination, where temperatures
are highest.
2.
Attach to the faceplate of the termination using four sheet metal
screws.
Installing Heat Guards over Terminations
MSR
PTO-3
PTO-3F
PTO-3
PTO-3F
Vent Terminations
Содержание M38ODV-ST
Страница 13: ...Page 13 XG0128 M38ODV ST Direct Vented Fireplace Appendix A Spare Parts Accessories 2 3 ...
Страница 15: ...Page 15 XG0128 M38ODV ST Direct Vented Fireplace Notes ...
Страница 16: ...Canadian Heating Products Inc Langley BC V4W 4A1 Montigo Del Ray Corp Ferndale WA 98248 XG0128 Rev 0102 2005 ...