The Refrigeration and Freezer bases are produced with the best possible material and workmanship.
PROPER INSTALLATION IS ESSENTIAL FOR SAFE AND EFFICIENT TROUBLE-FREE OPERATION.
THE INSTALLATION INSTRUCTIONS CONTAINED HEREIN ARE FOR THE
USE OF QUALIFIED INSTALLATION AND SERVICE PERSONNEL ONLY.
INSTALLATION OR SERVICE BY OTHER THAN QUALIFIED PERSONNEL
MAY RESULT IN DAMAGE TO THE EQUIPMENT AND/OR INJURY TO THE
OPERATOR.
Qualified installation personnel are individuals, a firm, corporation or company which
either in person, or through a representative are engaged in, and are responsible for:
The installation of electrical wiring from the electric meter, main control box or
service outlet to the electric appliance. Qualified personnel must be experienced in
such work, be familiar with all precautions required and have complied with all
requirements of state and local authorities having jurisdiction. Reference: National
Electric Code, N.F.P.A. No. 70– latest addenda.
READ CAREFULY AND FOLLOW THESE INSTRUCTIONS
THIS UNIT WHEN INSTALLED MUST BE ELECTRICALLY GROUNDED
IN ACCORDANCE WITH LOCAL CODES, OR IN ABSENCE OF LOCAL
CODES, WITH THE NATIONAL ELECTRICAL CODE, ANSI/NFPA No.70–
LATEST ADDENDA.
PROVISIONS MUST BE MADE FOR ADEQUATE AIR SUPPLY TO THE UNIT.
Содержание FB-108-R
Страница 26: ...BLACK WIRING DIAGRAM RB SC R REFRIGERATED BASE SELF CONTAINED REMOTE 21...
Страница 27: ...WIRING DIAGRAM FB SC R FREEZER BASE SELF CONTAINED REMOTE 22...
Страница 28: ...COMPRESSOR COMPARTMENT EXPLODED VIEW 23...
Страница 29: ...EVAPORATOR COIL 24...
Страница 30: ...TOP DRAWER ASSEMBLY EXPLODED VIEW 25...
Страница 31: ...BOTTOM DRAWER ASSEMBLY EXPLODED VIEW 26...