
Operation
6
5.
Raise the jack stand and remount
horizontally on the storage bracket.
6. Lower the planter to the planting position
and check that the planter is level (front to
back and side to side). If the hitch height is
too high or too low, disconnect the planter
and adjust the hitch clevis in an up or down
position as necessary.
LEVELING THE PLANTER
For proper operation of the planter and row
units, it is important that the unit operate
level.
Unless the tractor drawbar is adjustable for
height, the fore and aft level adjustment must
be maintained by the position of the hitch
clevis. Holes in the hitch bracket allow the
clevis to be raised or lowered. When
installing clevis mounting bolt, tighten hex
nut to proper torque setting.
With the planter lowered to proper operating
depth, check to be sure the frame is level
fore and aft (front to back and side to side).
Recheck once the planter is in the field.
It is also important for the planter to operate
level laterally. Tire pressure must be
maintained at pressures specified.
TIRE PRESSURE
Tire pressure should be checked regularly
and maintained as follows :
Transport Ground Drive : 7.50" x 20" - 40 psi
(2,7 bars)
Contact Drive : 4.10" x 8"- 60 psi (4 bars)
DANGER Rim and tire servicing
can be dangerous. Explosive separation
of a tire and rim parts can cause serious
injury or death.
Do not attempt to mount a tire unless you
have the proper equipment and
experience to perform the job. This
should only be done by properly trained
and equipped to do the job.
Maintain the correct tire pressure. Do not
inflate the tires above the recommended
pressure.
When inflating tires, use a clip-on air
chuck and extension hose long enough
to allow you to stand to one side, and not
in front of or over the tire assembly. Use
a safety cage to enclose the tire and
assembly when inflating.
Inspect tires and wheels daily. Do not
operate with low pressure, cuts, bubbles,
damaged rims or missing lug bolts and
nuts.
http://hespareparts.com
Содержание NG Plus 2
Страница 15: ...Operation 13 1 2 6 7 11 4 3 5 8 10 Fig 40 Fig 41 Fig 42 9 h t t p h e s p a r e p a r t s c o m...
Страница 34: ...Maintenance 32 h t t p h e s p a r e p a r t s c o m...
Страница 38: ...h t t p h e s p a r e p a r t s c o m...
Страница 39: ...SPARE PARTS h t t p h e s p a r e p a r t s c o m...
Страница 40: ...EXTRA HIGHT OUTPUT TURBOFAN FR 38 h t t p h e s p a r e p a r t s c o m...
Страница 43: ...PLANTING UNIT NG PLUS 2 FR 41 h t t p h e s p a r e p a r t s c o m...
Страница 46: ...METERING BOX NG PLUS FR 44 h t t p h e s p a r e p a r t s c o m...
Страница 48: ...MICROSEM FR 46 h t t p h e s p a r e p a r t s c o m...
Страница 50: ...FERTILIZER FR 48 h t t p h e s p a r e p a r t s c o m...
Страница 52: ...PVC PIPE AND HOSE ASSEMBLY US 50 h t t p h e s p a r e p a r t s c o m...
Страница 53: ...FRAME ASSEMBLY US 51 h t t p h e s p a r e p a r t s c o m...
Страница 62: ...LIFT WHEEL ASSEMBLY US 60 h t t p h e s p a r e p a r t s c o m...
Страница 63: ...DRIVE WHEEL ASSEMBLY US 61 h t t p h e s p a r e p a r t s c o m...
Страница 66: ...TRANSMISSION ASSEMBLY US 64 h t t p h e s p a r e p a r t s c o m...
Страница 69: ...HYDRAULIC ASSEMBLY US 67 h t t p h e s p a r e p a r t s c o m...