49-80152 Rev. 8
11
Installation Instructions
2A
INSTALL HOOD ONTO WALL
SKIP THIS STEP IF INSTALLING BENEATH A
SOFFIT OR CABINET, GO TO STEP 2B.
■ Locate at least 2 vertical studs at the wood support.
■ Center the supplied wood support, left to right and
below the 15-3/8" marked line.
■ Secure the wood support to 2 or more vertical studs,
using at least 2 of the 4 supplied long screws.
IMPORTANT:
Screws must penetrate at least 1-1/2" into
vertical studs. Countersink screws into support.
NOTE:
The mounting screws must remain in their
original shipping location. These screws are positioned
to engage the keyhole slots in the back of the hood.
■ Adjust depth of original mounting screws in the wood
support until they protrude 1/4" forward. This 1/4" gap
will provide clearance to hang the hood.
IMPORTANT:
Framing must be capable of
supporting up to 150 lbs.
Install Transition Onto Top of Hood
IMPORTANT:
Remove
shipping tape from damper
and check that damper
moves freely.
■ Place the transition piece
over the hood exhaust
and secure with 4 screws
provided.
■ Use duct tape to seal the connection. Check to be
sure the damper moves freely.
Hang Hood On Wood Support
■ Lift the hood and hold close to the installation location.
Route house wiring through the knockout and into the
junction box.
■ Place the hood over the wood support. Be sure the
mounting screws engage the keyhole slots in the back
of the hood. Tighten the screws.
WARNING
Continue to provide additional support
while the hood is mounted with only these 2 screws.
These screws will not support the weight of the hood. The
hood could fall resulting in damage or personal injury.
■ Check to be sure
the hood is level and
centered.
Test Duct Cover Fit
■ Place duct cover(s)
over the top of the
hood to check for gaps.
Adjust the hood up or
down if necessary.
Install Bottom
Mounting Screws
■ Drill 1/8" pilot holes into the two lower mounting
holes. Enlarge the holes if they did not enter studs
to 3/8". Insert anchors for wall fasteners into bottom
holes. Remove anchor screws and add flat washers
provided. Drive screws into anchors and tighten.
■ Install 4 additional screws through the back of the
hood and into the wood support.
Duct
Transition
Top of
Hood
Centerline of
Installation
Space
15-3/8"
30"
to
36"
Wood
Support
1/4"
Gap
Original Mounting
Screws as Shipped
Centerline of
Installation
Space
30"
to
36"
1” = 2.5 cm; 1’ = 0.3 m
Содержание ZV30S
Страница 1: ...INSTALLATION INSTRUCTIONS 30 36 and 48 Professional Vent Hoods Monogram com ...
Страница 15: ...49 80152 Rev 8 15 Notes ...
Страница 17: ...INSTRUCTIONS D INSTALLATION Hottes professionnelles de 30 po 36 po et 48 po Monogram com T O U T É L E V E R ...
Страница 31: ...49 80152 Rév 8 15 Notes ...