6
49-80152 Rev. 8
Advance Planning
ADVANCE PLANNING
Ductwork Planning
■ These vent hoods are equipped for 10” round
ductwork. For best performance, use 10” round
ductwork on the 48” wide hoods. 30” and 36” hoods
may be transitioned to 8” round.
■ This hood may be vented vertically through upper
cabinets, soffit or ceiling. A duct transition piece is
supplied for vertical exhaust. Use locally supplied
elbows to vent horizontally through the rear wall.
■ Determine the exact location of the vent hood.
■ Plan the route for venting exhaust to the outdoors.
■ Use the shortest and straightest duct route possible.
For satisfactory performance, duct run should
not exceed 150 ft. equivalent length for any duct
configurations.
■ Refer to “Duct Fittings” chart to compute the
maximum permissible length for duct runs to the
outdoors.
■ Use metal ductwork only.
■ Install a wall cap or roof cap with damper at the
exterior opening. Order the wall or roof cap and any
transition needed in advance.
■ When applicable, install any makeup (replacement)
air system in accordance with local building
code requirements. Visit
GEAppliances.com
for
available makeup air solutions.
Wall Framing for Adequate Support
■ These vent hoods are heavy. Adequate structural
support must be provided. Hoods must be secured
to vertical studs in the wall.
■ It is strongly recommend that the vent hood with
duct cover be on site before final framing and wall
finishing. This will also help to accurately locate the
ductwork and electrical service.
Decorative Duct Covers
Decorative duct covers, 6” and 12” high, are available
to fit all models. The duct cover conceals the ductwork
running from the top of the hood to the ceiling or
soffit. Stack one or more duct covers over the top of
the hood to reach your ceiling height.
POWER SUPPLY
IMPORTANT - (Please read carefully)
WARNING
FOR PERSONAL SAFETY, THIS
APPLIANCE MUST BE PROPERLY GROUNDED.
Remove house fuse or open circuit breaker before
beginning installation.
Do not use an extension cord or adapter plug with
this appliance. Follow National electrical codes or
prevailing local codes and ordinances.
Electrical supply
These vent hoods must be supplied with 120V, 60Hz,
and connected to an individual, properly grounded
branch circuit, and protected by a 15 or 20 amp circuit
breaker or time delay fuse.
■ Wiring must be 2 wire with ground.
■ If the electrical supply does not meet the above
requirements, call a licensed electrician before
proceeding.
■ Route house wiring as close to the installation
location as possible on the back wall or ceiling.
■ Connect the wiring to the house wiring in
accordance with local codes.
Grounding instructions
The grounding conductor must be connected to
a ground metal, permanent wiring system, or an
equipment-grounding terminal or lead on the hood.
WARNING
The improper connection of the
equipment-grounding conductor can result in a risk
of electric shock. Check with a qualified electrician or
service representative if you are in doubt whether the
appliance is properly grounded.
1” = 2.5 cm; 1’ = 0.3 m
Содержание ZV30S
Страница 1: ...INSTALLATION INSTRUCTIONS 30 36 and 48 Professional Vent Hoods Monogram com ...
Страница 15: ...49 80152 Rev 8 15 Notes ...
Страница 17: ...INSTRUCTIONS D INSTALLATION Hottes professionnelles de 30 po 36 po et 48 po Monogram com T O U T É L E V E R ...
Страница 31: ...49 80152 Rév 8 15 Notes ...