
-69-
Revision 6/F3590
©
Moffat Ltd, February 2005
9
9
1
2
3
4
5
6
7
8
7
7
8
7
7
7
•
Drill three ø3.5mm (
1
/
8
”) holes along each side of the bottom oven and secure with six
1
/
2
” x 8A pozi screws
(7)
.
• Position
the
chimney
(4)
on the rear of the units. Secure to the flue duct
(6)
and
bottom unit with four
1
/
2
” x 8A pozi screws
(7)
. (The holes in the bottom unit may need
to be drilled, ø3.5mm (
1
/
8
”)).
•
Secure the top of the chimney to the top unit with the chimney support
(5)
and two
1
/
2
”
x 8A pozi screws
(7)
. (These holes may need to be drilled, ø3.5mm (
1
/
8
”)).
•
Ensure that all screws on the stacking kit are tightened.
Figure B.1