20
4
Cleaning / Maintenance
Revision 3
©
Moffat Ltd, September 2009
E32SUBC OVEN and PROOFER
Proofer
Oven
4.3
Routine procedures
Procedure
Frequency
Check door seals for deterioration.
6 months
Check door pivot bushes for wear.
12 months
Ensure that door catches are adjusted such that the door closes properly
12 months
Check that the element resistances are correct to their rating, or that they are drawing the
correct current.
12 months
Procedure
Frequency
Remove scaling from wet element.
As required
Inspect door seal on door inside for wear and tear
6 months
Check door hinges for wear
12 months
Check that the element resistances are correct to their rating, or that they are drawing the
correct current.
12 months
Содержание turbofan E32SUBC
Страница 1: ...Moffat Ltd September 2009 Revision 3 E32SUBC OVEN and PROOFER E32SUBC Oven and Proofer Service Manual...
Страница 4: ...Moffat Ltd September 2009 Revision 3 E32SUBC OVEN and PROOFER...
Страница 49: ...45 7 Accessories Revision 3 Moffat Ltd September 2009 E32SUBC OVEN and PROOFER...
Страница 68: ...Moffat Ltd September 2009 Revision 3 E32SUBC OVEN and PROOFER...