Chapter 6: Operation (Profibus Units)
1579A/579A
42
Start Up the Mass Flow Controller
1. After you have successfully checked all mechanical and electrical connections and when
you are certain that there is no gas leakage, then power can be applied to the mass flow
controller or to the flow meter respectively.
The first start up should be done preferably using non-critical gas. This could be for
example nitrogen or dry air (if there are no reactive residuals in the plumbing system) or
any inert gas.
2. Switch on the power supply.
When power is first applied, the output signal jumps to + 7,5 V.
The unit performs automatically a reset, indicated by the red/green blinking status LED.
Finally the LED changes to green light which indicates that the electronic circuitry is ready
for use.
3. You can monitor the flow output signal as the instrument stabilizes and the output
approaches zero. Approximately 30 minutes after power up the signal should be stable
within some millivolts close to zero.
Note
Do not use dangerous gases for the first start up. Use a non-critical gas,
for example the gas which serves for purging.
Note
If the instrument is being used to control dangerous gases, be sure that
the system is fully warmed up before applying gases to the system. You
may choose to install a positive shutoff valve to prevent inadvertent gas
flow during the warm-up period.
Once the instrument is completely warmed up, you can zero the unit if necessary.
Содержание 1579A
Страница 8: ...Table of Contents 1579A 579A viii This page intentionally left blank...
Страница 12: ...Safety Information 1579A 579A 12 This page intentionally left blank...
Страница 16: ...Chapter 1 General Information 1579A 579A 16 This page intentionally left blank...
Страница 20: ...Chapter 2 Shipment 1579A 579A 20 This page intentionally left blank...
Страница 28: ...Chapter 3 Connectors and Control Elements 1579A 579A 28 This page intentionally left blank...
Страница 38: ...Chapter 5 Operation Analog Units 1579A 579A 38 This page intentionally left blank...
Страница 70: ...Chapter 10 Maintenance 1579A 579A 70 This page intentionally left blank...
Страница 74: ...Appendix A Product Specifications 1579A 579A 74 This page intentionally left blank...
Страница 82: ...Appendix C Gas Correction Factors 1579A 579A 82 This page intentionally left blank...
Страница 84: ...Appendix C Gas Correction Factors 1579A 579A 84 This page intentionally left blank...
Страница 86: ...Next page Health and Safety Form Contact MKS at the web or at any MKS location if the form is missing...