12
OCH771
3
FEATURES
CHARGELESS SYSTEM
PRE-CHARGED REFRIGERANT IS SUPPLIED FOR PIPING LENGTH AT SHIPMENT
Maximum 30 m (ZM60/71/200/250)/Maximum 40 m (ZM100/125/140)
The refrigerant circuit with LEV (Linear Expansion Valve) and power receiver/accumulator always control the optimal
refrigerant level regardless of the length (30 m (ZM60/71/200/250)/40 m (ZM100/125/140) maximum and 5 m minimum)
of piping. The additional refrigerant charging work during installation often causes problems. It is completely eliminated by
chargeless system. This unique system improves the quality and reliability of the work done. It also helps to speed up the
installation time.
PUZ-ZM100VKA2(-ET/-ER)
PUZ-ZM125VKA2(-ET/-ER)
PUZ-ZM140VKA2(-ET/-ER)
PUZ-ZM100YKA2(-ET/-ER)
PUZ-ZM125YKA2(-ET/-ER)
PUZ-ZM140YKA2(-ET/-ER)
PUZ-ZM200YKA2
PUZ-ZM250YKA2
PUZ-ZM60VHA2(-ET/-ER)
PUZ-ZM71VHA2(-ET/-ER)
Case 2: for floor standing (PSA-M)
Floor standing (PSA-M)
h0 = 0 [m]
M [kg]
Amin [m²]
< 1.84
1.84
No requirements
2.0
6
6
2.5
7
3.0
9
3.5
10
4.0
11
4.5
13
5.0
14
5.5
15
6.0
17
6.5
18
7.0
20
7.5
21
8.0
22
8.5
24
9.0
25
9.5
26
Содержание PUZ-ZM60VHA2
Страница 21: ...21 OCH771 PUZ ZM60VHA2 ET ER UK PUZ ZM71VHA2 ET ER UK 6 OUTLINES AND DIMENSIONS 1 2 1 1 2 Unit mm ...
Страница 23: ...23 OCH771 PUZ ZM60VHA2 ET ER UK PUZ ZM71VHA2 ET ER UK 7 WIRING DIAGRAM ...
Страница 24: ...24 OCH771 PUZ ZM100VKA2 ET ER UK ...
Страница 25: ...25 OCH771 PUZ ZM125VKA2 ET ER UK PUZ ZM140VKA2 ET ER UK ...
Страница 26: ...26 OCH771 PUZ ZM100YKA2 ET ER UK PUZ ZM125YKA2 ET ER UK PUZ ZM140YKA2 ET ER UK ...
Страница 27: ...27 OCH771 PUZ ZM200YKA2 UK PUZ ZM250YKA2 UK ...