66
OCH771
(4) Releasing emergency operation
1
Turn the main power supply off.
2
Set the emergency operation switch (SWE) on indoor controller board to OFF.
3
Set the shorting pins of emergency operation connector (CN31) on outdoor controller
board to OFF.
4
Set SW4-2 on outdoor controller board as shown in the right.
Note: If shorting pins are not set on emergency operation connector (CN31), the setting remains OFF.
SW4
1
2
Cooling
Heating
ON
10-7. EMERGENCY OPERATION
(1) When any check codes shown below is displayed on outdoor unit, or microcomputer for wired remote controller or indoor
unit has a failure while no other problems are found, emergency operation will be available by setting the emergency opera-
tion switch (SWE) ON and short-circuiting the connector (CN31) on outdoor controller board.
(2) Check the following items and cautions for emergency operation
1
Make sure that there is no abnormality in outdoor unit other than the above abnormalities. (Emergency operation will not
be available when check code other than the above are indicated.)
2
For emergency operation, it is necessary to set the emergency operation switch (SWE) on indoor controller board. Refer
to the electrical wiring diagram of indoor unit for how to set the indoor unit.
3
During emergency operation, the air-conditioner will continuously be operated by supplying power and stopping it: It can
not be turned on or off by remote control, and temperature control is not possible.
4
Do not perform emergency heating operation for an extended period of time: If the outdoor unit starts defrosting during
this period, cold air will blow out from the indoor unit.
5
Do not perform emergency cooling operation for more than 10 hours: Neglecting this could result in freezing the heat
exchanger in indoor unit.
Inspected content
Open/short of outdoor unit thermistor (TH3/TH6/TH7/TH8)
Indoor/outdoor unit communication error • Signal receiving error (Outdoor unit)
Indoor/outdoor unit communication error • Transmitting error (Indoor unit)
Communication error other than outdoor unit
Communication error between outdoor controller board and M-NET board (Serial communication error)
Check code
U4
E8
E9
E0
–
E7
Ed
●
When following abnormalities occur, emergency operation will be available.
(3) Emergency operation procedure
1
Turn the main power supply off.
2
Turn on the emergency operation switch (SWE) on indoor controller board.
3
Set the shorting pins of emergency operation connector (CN31) on outdoor controller board to ON.
4
Use SW4-2 on outdoor controller board to set the operation mode (cooling or heating). (SW4-1 is not used.)
5
Turning the main power supply on will start the emergency operation.
SW4
1
2
Cooling
Heating
ON
ON
OFF
CN31
Shorting pins
Содержание PUZ-ZM60VHA2
Страница 21: ...21 OCH771 PUZ ZM60VHA2 ET ER UK PUZ ZM71VHA2 ET ER UK 6 OUTLINES AND DIMENSIONS 1 2 1 1 2 Unit mm ...
Страница 23: ...23 OCH771 PUZ ZM60VHA2 ET ER UK PUZ ZM71VHA2 ET ER UK 7 WIRING DIAGRAM ...
Страница 24: ...24 OCH771 PUZ ZM100VKA2 ET ER UK ...
Страница 25: ...25 OCH771 PUZ ZM125VKA2 ET ER UK PUZ ZM140VKA2 ET ER UK ...
Страница 26: ...26 OCH771 PUZ ZM100YKA2 ET ER UK PUZ ZM125YKA2 ET ER UK PUZ ZM140YKA2 ET ER UK ...
Страница 27: ...27 OCH771 PUZ ZM200YKA2 UK PUZ ZM250YKA2 UK ...