101
OCH771
11. Removing the reactor (DCL)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box. (See Photo 4)
(4) Remove 3 reactor fixing screws (4 × 10) and remove the
reactor.
Note 1: The reactor is attached to the rear of the electrical
parts box.
Note 2: The reactor has polarity: A care must be taken if
reassembling the reactor. (See Photo 11)
10. Removing the high pressure switch (63H)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box. (See Photo 4)
(4) Remove 3 right side panel fixing screws (5 × 12) in the
rear of the unit and remove the right side panel.
(5) Pull out the lead wire of high pressure switch.
(6) Recover refrigerant.
(7) Remove the welded part of high pressure switch.
Note 1: Recover refrigerant without spreading it in the air.
Note 2: The welded part can be removed easily by
removing the right side panel.
Note 3: When installing the high pressure switch, cover
it with a wet cloth to prevent it from heating (100°C
or more), then braze the pipes so that the inside
of pipes are not oxidized.
Reactor fixing screws
Lead wire of
high pressure switch
High pressure switch (63H)
Photo 10
Electrical parts box
Reactor fixing screws
Reactor
(DCL)
Photo 11
Marked
wirings*
*The marked wirings must be connected to the opposite
terminal of the reactor.
OPERATING PROCEDURE
PHOTOS/FIGURES
Содержание PUZ-ZM60VHA2
Страница 21: ...21 OCH771 PUZ ZM60VHA2 ET ER UK PUZ ZM71VHA2 ET ER UK 6 OUTLINES AND DIMENSIONS 1 2 1 1 2 Unit mm ...
Страница 23: ...23 OCH771 PUZ ZM60VHA2 ET ER UK PUZ ZM71VHA2 ET ER UK 7 WIRING DIAGRAM ...
Страница 24: ...24 OCH771 PUZ ZM100VKA2 ET ER UK ...
Страница 25: ...25 OCH771 PUZ ZM125VKA2 ET ER UK PUZ ZM140VKA2 ET ER UK ...
Страница 26: ...26 OCH771 PUZ ZM100YKA2 ET ER UK PUZ ZM125YKA2 ET ER UK PUZ ZM140YKA2 ET ER UK ...
Страница 27: ...27 OCH771 PUZ ZM200YKA2 UK PUZ ZM250YKA2 UK ...