–81–
(2)
Control Box
Be careful on removing heavy parts.
Procedure
Photos
<CMB-P104, 105, 106NU-F>
1. Removing the single screw that secures the elec-
tric panel box cover provides access to the box con-
tents for checking.
1
Check electrical lead wires and transmission
lead terminal connections.
2
Check the transformer.
3
Check the address switch.
4
Use the self-diagnostic switch to check the LED
display.
2. Disconnect the power supply lead, transmission
lead, transformer lead connector, and address
switch wiring connector. Removing the screw se-
curing the inner cover provides access for checking
the entire controller board.
3. Note the following precautions whenever replacing
the controller board.
1
Take care to avoid mistakes when connecting
leads and connectors, and double-check for in-
complete and loose connections.
2
Check to make sure that DIP switch settings are
the same before and after replacement.
Important!
You do not need to remove the two electric panel
screws if you are checking electric panel box
contents only.
<CMB-P108, 1010, 1013, 1016NU-F>
Removing the single screw that secures the
electric panel box cover provides access to the
controller board and all of the relay board for
checking. So it is not necessary to work according
to above 2.
Содержание PURY-100TMU
Страница 8: ... 7 Controller Box ...
Страница 11: ... 10 G A board CNIPM1 CN15V1 CNDR1 CNE CNDC1 Power board ...
Страница 12: ... 11 BC controller CNTR CN02 M NET transmission CN03 CN12 Power supply 1 EARTH 3 N 5 L SW4 SW2 SW1 SW5 ...
Страница 13: ... 12 RELAY 10 board RELAY 4 board ...
Страница 14: ... 13 2 Refrigerant Circuit Diagram and Thermal Sensor ...
Страница 15: ... 14 3 Electrical Wiring Diagram 1 MC P N ...
Страница 17: ... 16 3 CMB 108 1010NU F ...
Страница 18: ... 17 4 CMB 1013 1016NU F ...
Страница 71: ... 70 Motor Compressor G A board Red U V W N P White Blue Blue Capacitor C1 Red IPM ...